Project List


NO | CLIENT | PROJECT DESCRIPTION | YEAR |
1 | PT. MERDEKA TSINGSHAN INDONESIA | Refractory installation Area Roaster 2 | Feb 25 |
2 | PT APP PURINUSA EKAPERSADA | CASTABLE;1400deg.C,7N/mm2,CREAM,25kg/BAG | Feb 25 |
3 | PT. LONTAR PAPYRUS PULP& PAPER | CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b | Feb 25 |
4 | PT. LONTAR PAPYRUS PULP& PAPER | Refractory Work Shutdown MB#24 Jan 25 | Feb 25 |
5 | PT INDOCEMENT ITP Plant 14 | Supply Castable RSP 60 G, RSP 60, dan RSP 13 | Feb 25 |
6 | PT INDOCEMENT TUNGGAL PRAKARSA Tbk | Supply Ceramic Paper Cerawil®, Density=200kg/m³, ≤1260°C, T3mm×W610mm×L20m | Feb 25 |
7 | PT. MERDEKA TSINGSHAN INDONESIA | Jasa Instalasi Castable ESP Flue Gas | Feb 25 |
8 | PT INDOCEMENT ITP Plant 9 | Supply Castable RSP 80T | Feb 25 |
9 | PT. ANTAM Tbk | Supply Low Cement Castable Refractory 60 Ton | Feb 25 |
10 | PT. ANTAM Tbk | Supply Low Cement Castable Refractory 60 Ton | Jan 25 |
11 | PT. ANTAM Tbk | Supply Low Cement Castable Refractory 60 Ton | Jan 25 |
12 | PT. ANTAM Tbk | Supply Low Cement Castable Refractory 60 Ton | Jan 25 |
13 | PT. LONTAR PAPYRUS PULP& PAPER | Refractory Work Shutdown MB#1,2 & PCB 24 | Jan 25 |
14 | PT. LONTAR PAPYRUS PULP& PAPER | CASTABLE;1037deg.C,2.07Kg/cm2,GREY,25Kg | Des 24 |
15 | PT APP PURINUSA EKAPERSADA | Supply Fire Brick | Des 24 |
16 | PT. LONTAR PAPYRUS PULP& PAPER | CASTABLE;1037deg.C,2.07Kg/cm2,GREY,25Kg | Des 24 |
17 | PT.PINDO DELI PULP AND PAPER MILLS | CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b | Des 24 |
18 | PT TOBA PULP LESTARI Tbk | Supply Castable Mix RSP 75, RKP LW 1200 R dan RSP 96 | Des 24 |
19 | PT PHOENIX RESOURCES INTERNAT1ONAL | Supply Castable Mlx MIXER-300 | Des 24 |
20 | PT PHOENIX RESOURCES INTERNAT1ONAL | Supply Castable Mlx RSP 75, RKP LヽV1200R, RKP 25 SIC, RKP 1700 RAM | Des 24 |
21 | PT SEMEN BATURAJA Tbk | CASTABLE HIGH ALUMINA, LOW CEMENT | Des 24 |
22 | PT INDOCEMENT ITP Plant 9 | Supply Castable RSP 60 Gdan RSP 80 T | Des 24 |
23 | PT INDOCEMENT ITP Plant 9 | Supply Castable RSP 80 T | Des 24 |
24 | PT INDOCEMENT ITP Plant 12 Tarjun | Supply Castable RSP 13 dan RSP 60 G | Des 24 |
25 | PT INDOCEMENT ITP Plant 11 | Suply Material Ceramic Fiber Cerawil | Nov 24 |
26 | PT.PINDO DELI PULP AND PAPER MIILLS | CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b | Nov 24 |
27 | PT. LONTAR PAPYRUS PULP& PAPER | Reafractory works RB 1 RB 2 RB 3 ASD 25 | Nov 24 |
28 | PT. LONTAR PAPYRUS PULP& PAPER | CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b | Nov 24 |
29 | PT. VALE INDONESIA | Supply High Alumina Castable RKP C16EV | Nov 24 |
30 | PT. MERDEKA TSINGSHAN INDONESIA | Installation Refractory Area 4304 & 4305 | Nov 24 |
31 | PT NICHIAS ROCKWOOL INDONESIA | Supply Castable RSP 96 | Oct 24 |
32 | PT INDOCEMENT ITP Plant 16 Maros | Suply Material Ceramic Fiber Cerawil dan Ceramic Fiber Blanket | Oct 24 |
33 | PT NUSANTARA TECHNIC INDONESIA | Supply Castable RKP C 16 R | Oct 24 |
34 | PT. MERDEKA TSINGSHAN INDONESIA | Installation Cost AIM Project Morowali | Oct 24 |
35 | PT. LONTAR PAPYRUS PULP& PAPER | Refractory Work Shutdown PCB & lOOPSEAL MB#4 | Sep 24 |
36 | PT. LONTAR PAPYRUS PULP& PAPER | Refractory work shutdown MB#3 Sept 2024 | Sep 24 |
37 | PT. MERDEKA TSINGSHAN INDONESIA | Refractory Work on Flue Gas Pipeline | Sep 24 |
38 | PT INDONESIA ASAHAN ALUMINIUM | Pergantian Refractory Lining MF 710 | Sep 24 |
39 | APP SINARMAS | Castable, Firebrick | Sep 24 |
40 | PT. GARVA BERKAT USAHA | Supply Castable RSP-80 | Aug 24 |
41 | PT. LONTAR PAPYRUS PULP& PAPER | Refractory Work Shutdown MB#23&24 Jul24 | Aug 24 |
42 | PT. LONTAR PAPYRUS PULP& PAPER | Refrac. Work Shutdown MB#1,2 & PCB Jul24 | Aug 24 |
43 | PT CEMINDO GEMILANG | Castable and Refractory Anchors | Aug 24 |
44 | PT TRUBAJAGA CITA | Pekerjaan Fabrikasi dan Jasa Insulation untuk Proyek OKI#2 Recovery Boiler, Vacuum Evaporator dan Fiber Line | Jul 24 |
45 | PT TRUBAJAGA CITA | Pekerjaan Pemasangan Refractory Proyek PT Cikarang Listrindo Babelan – Bekasi | Jul 24 |
46 | PT TRUBAJAGA CITA | Pekerjaan Pemasangan Isolasi dan Suplai Material PT Cikarang Listrindo Babelan – Bekasi | Jun 24 |
47 | PT INDAHKIAT PULP & PAPER Tbk | CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b | Jun 24 |
48 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory Work RB#2 Unplan Shutdown 24 | Jun 24 |
49 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory work shutdown MB#3 Mei 2024 | Jun 24 |
50 | PT ANTAM | Supply Refractory Castable 30 Ton | Jun 24 |
51 | PT ANTAM | Supply Castable Mix Retractory | May 24 |
52 | PT INDAHKIAT PULP & PAPER Tbk | CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b | May 24 |
53 | PT INDAHKIAT PULP & PAPER Tbk | CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b | May 24 |
54 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b | May 24 |
55 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory Work Shutdown MB#22 & 23 April | May 24 |
56 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b | May 24 |
57 | PT INDOCEMENT ITP Plant 02 Citeureup | KSD – Castable For Grate Cooler P11 Area Franco Citeureup RSP 80 T dan RSP 60 G | Apr 24 |
58 | PT INDOCEMENT ITP Plant 02 Citeureup | KSD – Insulation For Refractory Job Kiln P11 RSP 13 | Apr 24 |
59 | PT INDOCEMENT ITP Plant 03 Cirebon | Supply Castable RSP 80 T | Apr 24 |
60 | PT INDOCEMENT ITP Plant 03 Cirebon | Supply Castable RSP 60 G dan RSP 80 T | Apr 24 |
61 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refactory Work Shutdown PCB & MB#24 | Mar 24 |
62 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory Work RB#1, RB#2 ASD 2024 | Mar 24 |
63 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refactory Work Shutdown MB#22,23 Feb 24 | Mar 24 |
64 | PT PARAMITRA GUNAKARYA CEMERLANG | CASTABLE;1400deg.C,7N/mm2,CREAM,25kg/BAG | Mar 24 |
65 | PT DIAN SWASTATIKA SENTOSA, TBK | CASTABLE;1650deg.C,1000kg/cm2,GREY,50kg/ | Feb 24 |
66 | PT INDAHKIAT PULP & PAPER Tbk | CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b | Feb 24 |
67 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | REFRACTORY WORK SHUTDOWN MB#23 15-16 JAN24 | Feb 24 |
68 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | SANDSITIRIZED SHUTDOWN MB#23 16-18 JAN24 | Feb 24 |
69 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | ADD. REFRACTORY WORK SD MB#24 7-23 JAN 24 | Feb 24 |
70 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | REFRACTORY WORK SHUTDOWN MB#24 JAN 2024 | Feb 24 |
71 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory Shutdown PCB Tgl 23 ~25 Jan24 | Feb 24 |
72 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory Work SD RB#1 27 Jan~05 Feb 24 | Feb 24 |
73 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory Work ShutDn MB#24 26~29 Des23 | Feb 24 |
74 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory Work Shutdown RB#2 Januari 24 | Feb 24 |
75 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | RefractoryWork SD MB#21,MB#23 03~05Jan24 | Feb 24 |
76 | PT MERDEKA TSINGSHAN INDONESIA | SERVICE, PRELIMINARIES | Feb 24 |
77 | PT MERDEKA TSINGSHAN INDONESIA | Additional Refractory Instalation | Feb 24 |
78 | PT MERDEKA TSINGSHAN INDONESIA | Refractory Castable RSP 60G | Feb 24 |
79 | PT SEMEN BATURAJA (PERSERO) Tbk | CASTABLEHIGH ALUMINA (MIN 80%), LOW CEMENT | Feb 24 |
80 | PT INDOCEMENT PLANT 14 | Supply Material Castable | Jan 24 |
81 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b | Jan 24 |
82 | PT MERDEKA TSINGSHAN INDONESIA | Installation Refractory Acid Brick for TNK 001 & TNK 002 | Jan 24 |
83 | PT MERDEKA TSINGSHAN INDONESIA | Supply material Sodium Silicate – AIM project | Jan 24 |
84 | PT MERDEKA TSINGSHAN INDONESIA | Add Anchor Refractory Ducting Tail Kiln to Settling Chamber | Jan 24 |
85 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory Work Shutdown PCB Desember 23 | Jan 24 |
86 | PT OKI Pulp & Paper Mills | INS.BLANKET;C.FIBRE,130KG/M3,25T,610W,72 | Jan 24 |
87 | PT MERDEKA TSINGSHAN INDONESIA | Supply material Sodium Silicate – AIM project | Jan 24 |
88 | PT MERDEKA TSINGSHAN INDONESIA | Add Anchor Refractory Ducting Tail Kiln to Settling Chamber | Jan 24 |
89 | PT INDOCEMENT PLANT 1 | Supply Material Castable | Jan 24 |
90 | PT INDOCEMENT PLANT 2 | Supply Material Castable | Jan 24 |
91 | Doosan Heavy Industries & Construction Co , Ltd Jakarta Representative Office | Scaffolding Erection Work(including Required Material Supply) | Des 23 |
92 | Doosan Heavy Industries & Construction Co , Ltd Jakarta Representative Office | Insulation Material Supply Work | Des 23 |
93 | Doosan Heavy Industries & Construction Co , Ltd Jakarta Representative Office | Insulation Application Work Muara Tawar Combined Cycle Power Plant Block 2, 3 & 4 Add-on | Des 23 |
94 | PT INDOCEMENT PLANT 16 | CASTABLEWORK OLEH PT. RGD SELAMA KILN OVERHAUL P16 DESEMBER 2023 | Des 23 |
95 | PT MERDEKA TSINGSHAN INDONESIA | Supply anchor refractory area Ducting to kiln | Des 23 |
96 | PT MERDEKA TSINGSHAN INDONESIA | Supply Material Ceramic Board | Des 23 |
97 | PT MERDEKA TSINGSHAN INDONESIA | AIM – Additional Refractory Work of PO6864 | Des 23 |
98 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory W RB#1 & RB#2 SD 05~18 Okt 23 | Nov 23 |
99 | PT MERDEKA TSINGSHAN INDONESIA | Supply Refractory castable Refractory, Anchor, Ceramic Rope dan Ceramic Paper – Area Outlet, Pipe, End Of Kiln Flue Gas Outlet Pipe | Nov 23 |
100 | PT MERDEKA TSINGSHAN INDONESIA | Supply Refractory castable Refractory, Anchor, Ceramic Fiber board dan Ceramic Paper – Area Ducting Kiln | Nov 23 |
101 | PT ANTAM | Supply Ceramic Blanket | Oct 23 |
102 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory SD PCB,MB#21 & MB#22 Agust 23 | Oct 23 |
103 | PT MERDEKA TSINGSHAN INDONESIA | Installation Refractory Area Head Ducting Kiln to Ring Cooler | Oct 23 |
104 | PT MERDEKA TSINGSHAN INDONESIA | Supply Material RSP 80 | Sep 23 |
105 | PT MERDEKA TSINGSHAN INDONESIA | Supply Material RSP 30 T & Ceramic Paper- Area Flue Gas Pipe | Sep 23 |
106 | PT MERDEKA TSINGSHAN INDONESIA | Supply Material Ceramic Paper 3mm 100 Roll Area Cooling Tower | Sep 23 |
107 | PT TRUBAJAGA CITA | Pekerjaan & Supply Material Painting & Sandblasting untuk EPC Of Upgrading Sejorong Fresh Water Pipeline System – PT Amman Mineral Nusa Tenggara, Sumbawa Barat | Sep 23 |
108 | PT TRUBAJAGA CITA | Jasa Pekerjaan Painting External Flange Spool Joint and Touchup Painting Body Damage untuk EPC, reroute of 54 inch sea water line and 12 inch fresh water line at concentrator – PT Amman Mineral Nusa Tenggara, Sumbawa Barat | Sep 23 |
109 | PT WIJAYA KARYA (Persero) Tbk | Pekerjaan Install Refractories Wing Walls (superheater) & Combustion Chamber, Lower Walls #2 (phase 1) – PT Wijaya Karya (Persero) Tbk | Sep 23 |
110 | PT MERDEKA TSINGSHAN INDONESIA | Supply Refractory Castable For Air Mixing Chamber | Sep 23 |
111 | PT MERDEKA TSINGSHAN INDONESIA | Installation Refractory For Area Flue Gas Outlet | Sep 23 |
112 | PT MERDEKA TSINGSHAN INDONESIA | Installation Refractory For Area Air Mixing Chamber | Aug 23 |
113 | PT MERDEKA TSINGSHAN INDONESIA | Supply Anchor Refractory | Aug 23 |
114 | PT MERDEKA TSINGSHAN INDONESIA | Installation Refractory For Dome Head Roaster Train 2 | Aug 23 |
115 | PT MERDEKA TSINGSHAN INDONESIA | Installation Insulation Pipe For Chain Grate | Aug 23 |
116 | PT MERDEKA TSINGSHAN INDONESIA | Installation Refractory For Acid Proof Ceramic Tile For Lower Sheel | Aug 23 |
117 | PT MERDEKA TSINGSHAN INDONESIA | Installation Refractory For Area Tower Packing. Product Acid Cooler & LSB Casing | Aug 23 |
118 | PT MERDEKA TSINGSHAN INDONESIA | Installation Refractory For Area Chloride | Aug 23 |
119 | PT MERDEKA TSINGSHAN INDONESIA | Installation Refractory for area cooling tower | Aug 23 |
120 | PT MERDEKA TSINGSHAN INDONESIA | Supply Refractory Castable | Aug 23 |
121 | PT MERDEKA TSINGSHAN INDONESIA | Installation Refractory For Area Air Mixing Chamber | Aug 23 |
122 | PT MERDEKA TSINGSHAN INDONESIA | Supply Mortar High Strengh | Aug 23 |
123 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory SD MB#23 & MB#24 15~28.06.23 | Aug 23 |
124 | PT INDOCEMENT PLANT 3 | CASTABLEWORK OLEH PT. RGD SELAMA KILN OVERHAUL P3 AGUSTUS 2023 | Aug 23 |
125 | PT INDOCEMENT PLANT 14 | CASTABLEWORK OLEH PT. RGD SELAMA KILN OVERHAUL P14 JULI 2023 | Jul 23 |
126 | PT MERDEKA TSINGSHAN INDONESIA | Supply Ceramic Fiber Blanket | Jul 23 |
127 | PT MERDEKA TSINGSHAN INDONESIA | Supply Ceramic Paper | Jul 23 |
128 | PT INDAHKIAT PULP & PAPER Tbk | CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b | Jul 23 |
129 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b | Jul 23 |
130 | PT MERDEKA TSINGSHAN INDONESIA | CastableFor Chain Grate Refractory | Jul 23 |
131 | PT SEAGULL COOLING TOWER | Pekerjaan Installation Insulation Piping & Ducting Tissue Machine 14.1, 14.2, 14.3 and 14.4 | Jul 23 |
132 | PT TRUBAJAGA CITA | Pekerjaan Jasa Insulation & Supply Material untuk Proyek RB#11 Replacement IsolasiEconomizer & Boiler Bank di IKPP Perawang | Jun 23 |
133 | PT MERDEKA TSINGSHAN INDONESIA | Installation Refractory For Area Grate Chain | Jun 23 |
134 | PT MERDEKA TSINGSHAN INDONESIA | Installation Refractory For Area Streamline Dry Section | Jun 23 |
135 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory Work RB#1 & RB#2 ASD23 (Add) | Jun 23 |
136 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory Work ShutDwn MB#23 13~24 Mei23 | Jun 23 |
137 | PT INDOCEMENT TUNGGAL PRAKARSA Tbk | Perjanjian Pengadaan dan Pemasangan Castable di semua plant di citeureup, palimanan dan tarjun plant site | May 23 |
138 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory Work RB#1 & RB#2 ASD 2023 | May 23 |
139 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory Work Shutdown PCB 21~29 Mar23 | May 23 |
140 | PT ENVIROMATE TECHNOLOGY INTERNATIONAL | EPC Pembangunan Pabrik Minyak Goreng 2.500 TPD | Apr 23 |
141 | PT HUTAMA KARYA (Persero) | Additional Insulation Desalination, Pipe Rack #2, HRSG #2.1 dan HRSG #2.2 | Apr 23 |
142 | PT HUTAMA KARYA (Persero) | Insulation Works For Block#3 And Block #4 (HRSG,BOP/Piperack & Turbine Package) | Apr 23 |
143 | PT TRUBAJAGA CITA | Pekerjaan Wrapping Pipe 16′ & 10′ untuk Proyek EPC, AND UPGRADING SEJORONG FRESH WATER PIPELINE SYSTEM PT. AMMAN MINERAL, NTT – SUMBAWA BARAT | Apr 23 |
144 | PT INDOCEMENT PLANT 11 | CASTABLEWORK OLEH PT. RGD SELAMA KILN OVERHAUL P11 APRIL 2023 | Mar 23 |
145 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory Shutdown MB#24 10~19 Feb 23 | Mar 23 |
146 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory Work SD MB#23 11 sd 18 Des 22 | Mar 23 |
147 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory Shutdown MB#24 01~07 Jan 23 | Mar 23 |
148 | PT INDOCEMENT PLANT 11 | CASTABLEWORK OLEH PT. RGD SELAMA KILN OVERHAUL P11 APRIL 2023 | Mar 23 |
149 | PT INDOCEMENT PLANT 11 | CASTABLEWORK OLEH PT. RGD SELAMA KILN OVERHAUL P11 APRIL 2023 | Mar 23 |
150 | PT INDOCEMENT PLANT 3 | CASTABLEWORK OLEH PT. RGD SELAMA KILN OVERHAUL P3 FEBRUARI 2023 | Feb 23 |
151 | PT ARAFURA SURYA ALAM (ASA) – J Resources | Pekerjaan & Supply Material Painting & Sandblasting untuk Project Gold Process Plant, Kotabunan, Bolaan, Magondow Timur – Sulawesi Utara | Feb 23 |
152 | PT INDAHKIAT PULP & PAPER Tbk | INS.BLANKET;R.WOOL,100kg/m3,50T,50.8D,10 dan INS.BLANKET;R.WOOL,100kg/m3,50T,76.2D,10 | Feb 23 |
153 | PT CATURELANG PERKASA | Supply Material & Installation Hot Insulation Piping & Tank | Feb 23 |
154 | PT CATURELANG PERKASA | TAR Open Insullation Valve and Pipe | Jan 23 |
155 | PT PINDODELI PULP & PAPER Tbk | CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b | Jan 23 |
156 | PT ASIA PACIFIC RAYON | New Insulation Cystallizer tank Viscose | Des 22 |
157 | PT INDAHKIAT PULP & PAPER Tbk | MB21 Shutdown, Insulation job | Des 22 |
158 | PT MERDEKA TSINGSHAN INDONESIA | REFRACTORY, (Acid Brick Lininng Tower & Kiln Area) – SMELTER MOROWALI ACID IRON METAL (AIM) PROJECT, PT. MERDEKA TSINGSHAN INDONESIA – Kawasan Industri Morowali – Sulawesi Tengah | Des 22 |
159 | PT MERDEKA TSINGSHAN INDONESIA | REFRACTORY & INSULATION INSTALLATION, (Roaster & Water Heater Boiler Area) and – SMELTER MOROWALI ACID IRON METAL (AIM) PROJECT, PT. MERDEKA TSINGSHAN INDONESIA – Kawasan Industri Morowali – Sulawesi Tengah | Des 22 |
160 | PT OKI PULP & PAPER MILLS Tbk | INS.BLANKET;R.WOOL+WIRE,80KG/CM3,100T,90 | Des 22 |
161 | PT DIAN SWASTATIKA SENTOSA, Tbk | CASTABLE;1400deg.C,7N/mm2,CREAM,25kg/Bag | Nov 22 |
162 | PT INDAHKIAT PULP & PAPER Tbk | MB 21 Repair isolasi | Nov 22 |
163 | PT INDAHKIAT PULP & PAPER Tbk | TG 25 SD, Insulation Job | Nov 22 |
164 | PT INDAHKIAT PULP & PAPER Tbk | INS.BLANKET;C.FIBRE,130kg/m3,25T,610W,72 | Nov 22 |
165 | PT INDAHKIAT PULP & PAPER Tbk | MB12.Repair support coloumb conv.11.ke-2 | Nov 22 |
166 | PT INDAHKIAT PULP & PAPER Tbk | MB13.Repair support coloum mixhopper k-3 | Nov 22 |
167 | PT INDAHKIAT PULP & PAPER Tbk | MB12.Conv.25,Replace frame conveyor | Nov 22 |
168 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory Shutdown MB#23 November 22 | Nov 22 |
169 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory ShutD MB23 & MB24 05~15 Okt22 | Nov 22 |
170 | PT TRUBAJAGA CITA | PROYEK EPC, AND UPGRADING SEJORONG FRESH WATER PIPELINE SYSTEM PT. AMMAN MINERAL, NTT – SUMBAWA BARAT | Oct 22 |
171 | PT INDAHKIAT PULP & PAPER Tbk | MB13;Support mix Hopper bgn tngh corosiv | Oct 22 |
172 | PT TRUBAJAGA CITA | Amandemen-1 Pekerjaan Jasa Insulation dan Painting OSBL dan ISBL Pindodeli Pulp dan Paper Mild – Karawang – Jawa Barat | Sep 22 |
173 | PT RIAU ANDALAN PULP AND PAPER | Insulation Tape, Thermal, ANY;100X25000X3MM-GFRP-5 | Sep 22 |
174 | PT SEMEN BATURAJA | CASTABLEHIGH ALUMINA, CASTABLE,LOW ALUMINA, NEEDLE EEL SUS 310, ANCHOR DLL | Sep 22 |
175 | PT DIAN SWASTATIKA SENTOSA, Tbk | CASTABLE;1400deg.C,7N/mm2,CREAM,25kg/BAG | Sep 22 |
176 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory Work SD PCB 20Agust~04Sept 22 | Sep 22 |
177 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory maintenance service boiler MB24 & MB23 | Sep 22 |
178 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory maintenance service boiler MB#23 | Aug 22 |
179 | PT INDAHKIAT PULP & PAPER Tbk | CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b | Aug 22 |
180 | PT INDAHKIAT PULP & PAPER Tbk | S.fuel ; Reposision tail pulley conv 14 | Aug 22 |
181 | PT INDAHKIAT PULP & PAPER Tbk | repair support coloumb | Jul 22 |
182 | PT INDAHKIAT PULP & PAPER Tbk | repair support coloumb mixhopper | Jul 22 |
183 | PT INDAHKIAT PULP & PAPER Tbk | Castable & Firebrick | Jul 22 |
184 | PT HUTAMA KARYA (Persero) | INSULATION AREA STEAM SYSTEM AND STEAM BYPASS SYSTEM #2 PART 3, For Project MUARA TAWAR COMBINED CYCLE POWER PLANT BLOCK 2, 3 & 4 Add-On PROJECT, Number: 228/SPP/HK-RGD/CCPP-MT/VII/2022 | Jul 22 |
185 | PT HUTAMA KARYA (Persero) | INSULATION AREA AUX STEAM SYSTEM #2,STEAM BYPASS SYSTEM & COMMON PART 12, For Project MUARA TAWAR COMBINED CYCLE POWER PLANT BLOCK 2, 3 & 4 Add-On PROJECT, Number:226/SPP/HK-RGD/CCPP-MT/VII/2022 | Jul 22 |
186 | PT HUTAMA KARYA (Persero) | INSULATION For Project MUARA TAWAR COMBINED CYCLE POWER PLANT BLOCK 2, 3 & 4 Add-On PROJECT, Amandemen – 1. Number: 217/AMD-1/SPP/HK-RGD/CCPP-MT/VII/2022 | Jul 22 |
187 | PT HUTAMA KARYA (Persero) | INSULATION AREA AUX STEAM SYSTEM #2,STEAM BYPASS SYSTEM & COMMON PART 1, For Project MUARA TAWAR COMBINED CYCLE POWER PLANT BLOCK 2, 3 & 4 Add-On PROJECT, Number: 224/SPP/HK-RGD/CCPP-MT/VI/2022 | Jun 22 |
188 | PT HUTAMA KARYA (Persero) | PROYEK Add-On PUSAT LISTRIK TENAGA GAS UAP MUARA TAWAR BLOK 2, 3 & 4 | Jun 22 |
189 | PT TRUBAJAGA CITA | Amandemen-1 Pekerjaan Jasa Insulation & Supply Material untuk Proyek P11 PT ITP Indocement Citeureup | Jun 22 |
190 | PT SEAGULL COOLING TOWER | Installation Insulation Piping Tissue Machine 14.1, 14.2, 14.3 and 14.4 | Jun 22 |
191 | PT SEMEN BATURAJA (PERSERO) Tbk | CASTABLEHIGH ALUMINA, CASTABLE,LOW ALUMINA, NEEDLE EEL SUS 310, ANCHOR DLL | Jun 22 |
192 | PT PINDODELI PULP AND PAPER MILLS | Pasang line steam Silo tm 31 | Jun 22 |
193 | PT PINDODELI PULP AND PAPER MILLS | Add linesteam silo tank tm 34 | Jun 22 |
194 | PT PINDODELI PULP AND PAPER MILLS | Add linesteam silo tank tm 32 | Jun 22 |
195 | PT PINDODELI PULP AND PAPER MILLS | Add linesteam silo tank tm 33 | Jun 22 |
196 | PT INDAHKIAT PULP & PAPER Tbk | RB-11 Dism’t & Install Insulation Wall B | Jun 22 |
197 | PT INDAHKIAT PULP & PAPER Tbk | TG3 Hot insulation of HP steam to TG3 | Jun 22 |
198 | PT INDOCEMENT PLANT 9 | CASTABLEWORK OLEH PT. RGD SELAMA KILN OVERHAUL P9 JUNI 2022 | Jun 22 |
199 | PT TRUBAJAGA CITA | Pekerjaan Jasa Insulation & Supply Material untuk Proyek RB#11 Replacement Boiler Bank di IKPP Perawang | Jun 22 |
200 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory maintenance service boiler MB#23 | May 22 |
201 | PT TRUBAJAGA CITA | Pekerjaan Jasa Instalasi Ducting HVAC Untuk Proyek TM14 – PT. Oki Pulp And Paper – Palembang – Sumatera Selatan C1103 | May 22 |
202 | PT HUTAMA KARYA (Persero) | INSULATION For Project MUARA TAWAR COMBINED CYCLE POWER PLANT BLOCK 2, 3 & 4 Add-On PROJECT, Number: 217/SPP/HK-RGD/CCPP-MT/V/2022 | May 22 |
203 | PT TRUBAJAGA CITA | Pekerjaan Jasa Insulation & Painting OSBL & ISBL untuk Pindo Deli Pulp Paper Mild, Kerawang Jawa Barat C2103 | Apr 22 |
204 | PT INDAHKIAT PULP & PAPER Tbk | CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b | Apr 22 |
205 | PT INDAHKIAT PULP & PAPER Tbk | MB#21 S/D Dismantle & install insulation | Apr 22 |
206 | PT INDAHKIAT PULP & PAPER Tbk | INSULATION,REPLACE;WATER CHILLED AHU CS6 | Apr 22 |
207 | PT INDAHKIAT PULP & PAPER Tbk | MB12; S/D Repair insulation water wall | Apr 22 |
208 | PT PINDODELI PULP AND PAPER MILLS | CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b | Apr 22 |
209 | PT INDAHKIAT PULP & PAPER Tbk | ASD P-9, Repair isolasi during shutdown | Apr 22 |
210 | PT INDOCEMENT PLANT 11 | Repair Castable at TAD, KOH P 11 | Mar 22 |
211 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory maintenance service boiler MB#21 | Mar 22 |
212 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory maintenance service boiler RB#21 | Feb 22 |
213 | PT JUHDISAKTI ENGINEERING | Pekerjaan Pemasangan dan Inolasi Tangki | Feb 22 |
214 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#23 | Feb 22 |
215 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#24 | Feb 22 |
216 | PT INDAHKIAT PULP & PAPER Tbk | MB23, SD plugging APH SAF & PAF | Jan 22 |
217 | PT INDAHKIAT PULP & PAPER Tbk | FL-8 Hot Insulation Effluent Heat Recovery | Jan 22 |
218 | PT KRAKATAU STEEL | Jasa Perbaikan Refractory Reactor C1 & C2 ARP-CRM | Des 21 |
219 | PT INDAHKIAT PULP & PAPER Tbk | WP 2; Rewelding Barking Plate Rotor No. 1, 2, 3, 4, 5, 6, 7 & 8 & Repair Plate Chute to Bark Conv ( Add ) | Des 21 |
220 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#24 | Des 21 |
221 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#22 & MB#21 | Des 21 |
222 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#24 | Nov 21 |
223 | PT CATURELANG PERKASA | Remove and Install Insulation at SK-45, SK-70 During TAR 2021 Activity_SO.4203.3252.XI.21 | Nov 21 |
224 | PT CATURELANG PERKASA | Supply and install Hot Insulation Pipe and Valve, Fabrication & Installation hot insulation cond pre heater, modification plate fot JT-VLV & plate from access operation VLV OP 7_SO.4148.3252.XI.21 | Nov 21 |
225 | PT CATURELANG PERKASA | Supply and install Hot Insulation Pipe and Valve, TAR Open Insulation Valve and Pipe_SO.4147.3252.XI.21 | Nov 21 |
226 | PT CATURELANG PERKASA | Supply and install Hot Insulation Pipe and Valve, TAR Support Remove and re-install insulation_SO.4141.3252.XI.21 | Nov 21 |
227 | PT INDAHKIAT PULP & PAPER Tbk | PB-2 SOLID FUEL. CUT OFF & DISMANTLE FRMAE CONVEYOR 12 BARK YARD | Nov 21 |
228 | PT INDAHKIAT PULP & PAPER Tbk | MB12. CONV 9 REPOTITION HD PULLEY & REPLACE CHUTE CONV 10 | Nov 21 |
229 | PT INDAHKIAT PULP & PAPER Tbk | MB12. CONV 8 REPOTITION HD PULLEY & REPLACE CHUTE TO BIN 2 | Nov 21 |
230 | PT OKI PULP & PAPER MILLS Tbk | Supply Brick ; 1650DEG.C,250W,300L,103/92.7T | Oct 21 |
231 | PT PINDODELI PULP AND PAPER MILLS | SD MB25 Install line cooling water IDF | Oct 21 |
232 | PT INDAHKIAT PULP & PAPER Tbk | MB21, Line Sumpit Pump to Cooling tower | Oct 21 |
233 | PT INDAHKIAT PULP & PAPER Tbk | PG 2 Hot Insulation For HP Steam Piping F | Oct 21 |
234 | PT INDAHKIAT PULP & PAPER Tbk | MB#21install line injection lime stone | Oct 21 |
235 | PT PINDODELI PULP AND PAPER MILLS | MB25 Shut Down, Reposisi Line ESP A1 to Ash Silo | Oct 21 |
236 | PT OKI PULP & PAPER MILLS Tbk | Supply Fire Brick ;1650deg.C,250W,198L,103/92.7T | Oct 21 |
237 | PT OKI PULP & PAPER MILLS Tbk | Supply Fire Brick ;1650deg.C,250W,198L,83/74.5T | Oct 21 |
238 | PT OKI PULP & PAPER MILLS Tbk | Supply Fire Brick ;1650deg.C,250W,198L,93/84.5T | Oct 21 |
239 | PT OKI PULP & PAPER MILLS Tbk | Supply Fire Brick ;1650DEG.C,250W,300L,103/94.5T | Oct 21 |
240 | PT OKI PULP & PAPER MILLS Tbk | Supply Fire Brick ;1650DEG.C,250W,300L,103/92.7T | Oct 21 |
241 | PT OKI PULP & PAPER MILLS Tbk | Supply Fire Brick ; 1650deg. C, 250 W, 198L, 103/94.5T | Oct 21 |
242 | PT LONTAR PAPYRUS PULP & PAPER INDUSTRY | Refractory maintenance service boiler MB#24 | Sep 21 |
243 | PT WASAMITRA ENGINEERING | Refractory Project PLTU Barru 1 X 100 MW | Sep 21 |
244 | PT INDAHKIAT PULP & PAPER, Tbk | PPM 6 REPAIR BASE PLATE JUMBO ROLL ( 2 UNIT ) | Sep 21 |
245 | PT INDAHKIAT PULP & PAPER, Tbk | MB25,Wall SCrew E,Replace Screw | Aug 21 |
246 | PT INDAHKIAT PULP & PAPER, Tbk | MB25, Install Hose Roll For Cleaning Bunker, Coal Feeder, Bottom Ash Loopseal, ESP, Conveyor 11 & Secondary Crusher) | Jul 21 |
247 | PT INDAHKIAT PULP & PAPER, Tbk | MB24, Install Hose Roll For Cleaning Bunker, Coal Feeder, Bottom Ash Loopseal & ESP | Jul 21 |
248 | PT INDAHKIAT PULP & PAPER, Tbk | MB23/MB24, Replace Plate Under Belt Coal Conveyor 01A & 01B. (Audit MHO And Safety) | Jul 21 |
249 | PT INDAHKIAT PULP & PAPER, Tbk | MB23/MB24, Replace Plate Under Belt Coal Conveyor 03A & 03B. (Audit MHO And Safety) | Jul 21 |
250 | PT INDAHKIAT PULP & PAPER, Tbk | MB23/MB24, Replace Plate Under Belt Coal Conveyor 02A & 02B. (Audit MHO And Safety) | Jul 21 |
251 | PT INDOCEMENT PLANT 9 | Repair Castable at Cooler P 9 | Jun 21 |
252 | PT INDAHKIAT PULP & PAPER, Tbk | MB25, New Install Line Pipe Lime Stone from MB26 Silo to SA Lower MB25 | Jun 21 |
253 | PT INDAHKIAT PULP & PAPER, Tbk | MB#21 Replace Drag Chain Bark Conveyor 24 | Jun 21 |
254 | PT INDAHKIAT PULP & PAPER, Tbk | MB#26 : Shutdown, Replace Wall Screw & Casing (Total Set) | Jun 21 |
255 | PT INDAHKIAT PULP & PAPER, Tbk | WP-2 Chip conveyor from chip screen UTC | May 21 |
256 | PT INDAHKIAT PULP & PAPER, Tbk | WP2;repair chip conveyor to digester M16 | May 21 |
257 | PT INDAHKIAT PULP & PAPER, Tbk | PWP-Repair & Repainting pipe bridge & pipe rack SK 11 to TG 23 | May 21 |
258 | PT INDAHKIAT PULP & PAPER, Tbk | WP-2 Chip conveyor to chip pile -1 (M007 | May 21 |
259 | PT INDAHKIAT PULP & PAPER, Tbk | WP-8 Repair chip conveyor 3 HHQ | May 21 |
260 | PT INDAHKIAT PULP & PAPER, Tbk | WP-2 Chip conveyor to chip pile -2 (M005 | May 21 |
261 | PT INDAHKIAT PULP & PAPER, Tbk | WP-2 Chip conveyor to digester | May 21 |
262 | PT INDAHKIAT PULP & PAPER, Tbk | WP2:repair chip conveyor M005 | May 21 |
263 | PT INDAHKIAT PULP & PAPER, Tbk | WP-2 Chip conveyor 2 to digester (M117) | May 21 |
264 | PT INDAHKIAT PULP & PAPER, Tbk | WP-8 Repair Chip Conveyor From Chip Screen HHQ | May 21 |
265 | PT PURINUSA EKA PERSADA | REPAIR,FIREBRICK FURNACE BOILER | May 21 |
266 | PT INDOCEMENT PLANT 14 | Repair Castable at TAD, Cooler P 14 | May 21 |
267 | PT INDOCEMENT PLANT 9 | Installalation Maintenance Refractory Plant 9 – Cirebon | May 21 |
268 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#22 RB#23 | Apr 21 |
269 | PT INDOCEMENT PLANT 14 | Project Refractory Plant 14 – Citeureup | Apr 21 |
270 | PT JURONG ENGINEERING LESTARI | Insulation Works STG & BOP | Mar 21 |
271 | PT JURONG ENGINEERING LESTARI | Insulation Works Stack and Outlet Duct Insulation works for HRSG Unit | Mar 21 |
272 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#21 RB#22 | Mar 21 |
273 | PT INDOCEMENT PLANT 11 | Project Refractory Plant 11 – Citeureup | Feb 21 |
274 | PT LONTAR PAPYRUS PULP & PAPER | Project PCB Boiler | Feb 21 |
275 | PT WIJAYA KARYA (Persero) Tbk | Supply Materials Hot Insulation P4 Project : EPC Storage Tanks Modification And Piping System RDMP RU V-Balikpapan | Des 20 |
276 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#24 | Des 20 |
277 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#22 | Des 20 |
278 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#23_RB#21 | Des 20 |
279 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler RB#3 | Nov 20 |
280 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#23 | Oct 20 |
281 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#24 | Sep 20 |
282 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#23 | Sep 20 |
283 | PT TRUBAJAYA ENGINEERING | Additional Insulation Works #2 & #3 For drain piping at pipe rack & steam sampling and piping system at STG Building | Sep 20 |
284 | PT BARATA INDONESIA (Persero) | Installastion Service Insulation Boiler Aux Unit 1 – PG Bombana, Sulawesi Tenggara | Aug 20 |
285 | PT LONTAR PAPYRUS PULP & PAPER | Project PCB Boiler | Aug 20 |
286 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler RB#2 | Aug 20 |
287 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler RB#1 | Aug 20 |
288 | PT HARBISON WALKER INDONESIA | Installation Service at PT. Jui Shin (PT. Semen Garuda) | Jun 20 |
289 | PT TRUBAJAGA CITA | Pekerjaan Jasa Insulation & Supply Material area PKS Fuel Feeding System For Boiler Cikarang Listrindo di Babelan, Bekasi Valmet Project | Jun 20 |
290 | PT TRUBAJAGA CITA | Pekerjaan Refractory area PKS Fuel Feeding System For Boiler Cikarang Listrindo di Babelan, BekasiValmet Project | Jun 20 |
291 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#24 | Jun 20 |
292 | PT UNIDEBY KENCANA QQ INDOCEMENT | Calciner Castable Repair Indocement P14 | May 20 |
293 | PT MORITA JAPANINDO UTAMA | Refractory Work For Hot Air Generator AF – 3006 Bantar Gebang – Bekasi | May 20 |
294 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#23 | Mar 20 |
295 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler RB#22 | Mar 20 |
296 | PT BARATA INDONESIA (Persero) | Insulation For Main Steam Line and Insulation Boiler and Auxillary – PG Bombana, Sulawesi Tenggara | Feb 20 |
297 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler RB#23 | Feb 20 |
298 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#24 | Feb 20 |
299 | PT TRUBAJAGA CITA | Supply and installasi materials InsulationProject P8 – PT ITP (INDOCEMENT) CITEUREUP C-2101 | Des 19 |
300 | PT WIJAYA KARYA (Persero) Tbk | Supply materials Insulation project EPC Site Development 5A Proyek RDMP RU-V Balikpapan | Nov 19 |
301 | PT WIJAYA KARYA (Persero) Tbk | Supply materials Insulation project EPC Site Development 4A Proyek RDMP RU-V Balikpapan | Oct 19 |
302 | PT WIJAYA KARYA (Persero) Tbk | Supply materials Insulation project EPC Site Development 3A Proyek RDMP RU-V Balikpapan | Oct 19 |
303 | PT WIJAYA KARYA (Persero) Tbk | Supply materials Insulation project EPC Site Development 2A Proyek RDMP RU-V Balikpapan | Sep 19 |
304 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler RB#22 | Des 19 |
305 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#23 | Nov 19 |
306 | PT TRUBAJAGA CITA | Wrappingand Insulation Work at Pindodeli Pulp and Paper Plant, Karawang- Jawa Barat | Oct 19 |
307 | PT TRUBAJAGA CITA | Paintingand Sand Blasting Work at Pindodeli Pulp and Paper Plant, Karawang – Jawa Barat | Sep 19 |
308 | PT ANTAMTbk | Supply Refarctory Material for Lining Production in Plant Refinery and Casting | Aug 19 |
309 | PT JURONG ENGINEERING LESTARI | Insulating Work for New of 4 Units of HRSG Boiler ,Muara Tawar Combined Cycle Power Plant, West Java , Indonesia | Aug 19 |
310 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#22 | Aug 19 |
311 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#24 | Jul 19 |
312 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler RB#1 | Jul 19 |
313 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler RB#2 | Jun 19 |
314 | PT TRUBAJAYA ENGINEERING | Painting& Sand Blasting Work at New Power Plant- CFSPP 2×100 MW Project, Kalsel Teng 2 | Jun 19 |
315 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#22 | Jun 19 |
316 | PT INDOCEMENT QQ PT HWI | Repair Castable at Grate Cooler | Jun 19 |
317 | PT KRAKATAU STEEL QQ PT HWI | Repair Castable of Main Runner – Blast Furnace | May 19 |
318 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#21 | May 19 |
319 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#22 | May 19 |
320 | PT HANA NUANSA PRATAMA | Supply and Installation Work of Insulation for HRSG, HP& LP Drum, Deator, Senipah Project, Kalimantan Timur | May 19 |
321 | PT INDOCEMENT QQ PT HWI | Repair Castable at Grate Cooler | May 19 |
322 | PT INDOCEMENT QQ PT HWI | Repair Castable at Grate Cooler and Tertiery Air Duct | Apr 19 |
323 | PT JUI SHIN INDONESIA QQ PT HWI | Repair Castable at Tertier Air Duct and Grate Cooler | Apr 19 |
324 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#22 | Apr 19 |
325 | PT LONTAR PAPYRUS PULP & PAPER | Refractory Maintenance Service Boiler MB#23 | Mar 19 |
326 | PT INDOCEMENT QQ PT HWI | Repair Castable at Grate Cooler | Jan 19 |
327 | PT TRUBAJAGA CITA | Supply & Installation Work to N1 Bag Filter Holcim Job Maintenance Narogong | Oct 18 |
328 | PT TRUBAJAYA ENGINEERING | Supply Insulation Material and Accessories for New CFB Power Plant , Project PLTU Kalsel -1 2×100, Tabalong Kalsel | Aug 18 |
329 | PT TRUBAJAYA ENGINEERING | ManpowerSupply For Insulation Work Project PLTU Kalsel -1 2x100mx New CFB – Power Plant , Tabalong Kalsel | Aug 18 |
330 | PT TRUBAJAYA ENGINEERING | Supply & Installation Work of Insulation to New Tisue Machine Plant of OKI Pulp and Paper, Palembang – Sumatera Selatan | Jul 18 |
331 | PT KARYASINAR SURYA | Supply of Insulation Material for Turbin Application of Kalsel -1, 2 x 100 MW New CFB Power Plant, Tabalong Kalsel | May 18 |
332 | PT TRUBAJAYA ENGINEERING | Insulation Work of Natural Gas Boiler Project – Chandra Asri Petrochemical, Cilegon Banten | Feb 18 |
333 | PT TRUBAJAYA ENGINEERING | Insulation Work at Ash Hopper Project Kalsel -1 2 X 100 MW New CFB Power Plant, Tanjung Tabalong, Kalsel | Mar 17 |
334 | PT TRUBAJAYA ENGINEERING | Supply & Installation Work of Insulation with Accessories at RM EP Convertion To Bag Filter Project Plant 10 , Palimanan | Mar 17 |
335 | PT CATURELANG PERKASA | Supply & Installation Work of Insulation at Windows Vessel Senoro Project Job PMTS | Mar 17 |
336 | PT CATURELANG PERKASA | Insulation Work at Senoro Project Job Pertamina Medco Tomori | Feb 17 |
337 | PT CATURELANG PERKASA | Supply & Installation Work of Insulation at Windows Vessel Senoro Project Job | Jan 17 |
338 | PT SINOMA ENGINEERING INDONESIA | Insulation Hot Gas Piping Work at 10.000 TPD Brownfield New Cement Plant 14 Project | Jan 17 |
339 | PT KRAKATAU ENGINEERING | Pipe Insulation Work at Lubricants Unit of Production Pertamina, UPPJ-Tj Priok, Jakarta | Okt 16 |
340 | PT TRUBAJAYA ENGINEERING | Insulation Work For Sinar Mas Group of New Plant Project – OKI PULP & PAPER MILLS, Palembang -South Sumatera | Jun 16 |
341 | PT TONSCO INTERNATIONAL | Insulation Work of Piping Area PT. Pertamina Talisman Jambi-Merang | Jun 16 |
342 | PT INDOCEMENT QQ PT HWI | Repair Castable at Grate Cooler | May 16 |
343 | PT INDOCEMENT QQ PT HWI | Repair Castable at Suspension Preheater | Apr 16 |
344 | PT WIKA REKAYASA KONSTRUKSI | Supply and Installation Work of Refractory at CFB-Power Plant, PT. Rayon Utama Makmur Solo | Apr 16 |
345 | PT SINOMA ENGINEERING INDONESIA | Insulation Work On Cement Grinding Including Small Duct of TPD Brownfield New Cement Plant 14 Project | Mar 16 |
346 | PT SINOMA ENGINEERING INDONESIA | Roof Water Leakage Repair & Cladding Installation For Limestone Storage TPD Brownfield New Cement Plant 14 Project | Mar 16 |
347 | PT INDOCEMENT QQ PT HWI | Repair Castable at Suspension Preheater | Mar 16 |
348 | PT SINOMA ENGINEERING INDONESIA | Insulation Work On Bag Filter Including Piping Area at 10,000 TPD Brownfield New Cement Plant 14 Project | Feb 16 |
349 | PT SINOMA ENGINEERING INDONESIA | Roof & Cladding Installation For Steel Structure Building 10,000 TPD Brownfield New Cement Plant 14 Project | Jan 16 |
350 | PT INDOCEMENT QQ PT HWI | Repair Castable at Tertiary Air Duct | Jan 16 |
351 | PT CATURELANG PERKASA | Supply Material & Installation of Box Exchanger Insulation at PT. Pertamina Talisman Jambi-Merang | Des 15 |
352 | PT CATURELANG PERKASA | Insulation Piping Work at PT. Pertamina Talisman Jambi-Merang | Aug 15 |
353 | PT PGAS SOLUTION | Supply and Installation of Insulation Material at Steam Heater Line Project KGJ1- Semarang | Aug 15 |
354 | PT CATURELANG PERKASA | Repair Insulation at SKN & PG Gas PT. Pertamina Talisman Jambi-Merang | Jun 15 |
355 | PT INDOCEMENT PLANT 8 | Repair Castable Suspension Preheater | May 15 |
356 | PT TRUBAJAYA ENGINEERING | Insulation Application TPD Brownfield New Cement Plant Project P14, Citeureup-Bogor | Apr 15 |
357 | PT INDOCEMENT PLANT 7 | Repair Castable at Grate Cooler | Apr 15 |
358 | PT INDOCEMENT PLANT 11 | Repair Castable at Tertiary Air Duct | Mar 15 |
359 | PT INDOCEMENT PLANT 6 | Repair Castable at Grate Cooler | Mar 15 |
360 | PT KRAKATAU ENGINEERING | Supply Material & Installation of Insulation at Pertamina, UPPJ Tj.Priok, Jakarta | Jan 15 |
361 | PT CATURELANG PERKASA | Supply Material & Installation of Insulation Piping PT.Pertamina Talisman Jambi-Merang | Dec 14 |
362 | PT REKAYASA ENGINEERING | Insulation Application of MEPIC Cabot Project – PT. Cabot Indonesia – Cilegon | Okt 14 |
363 | PT TRUBAJAYA ENGINEERING | Insulation Application of Sie Mangke T5104 Project – PT. Unilever-Medan | Sep 14 |
364 | PT INDOCEMENT PLANT 10 | Repair Castable at Suspension Preaheater, Coller | Sep 14 |
365 | PT DINUO INDONESIA | Insulation Work at Piping & Tank Project | Aug 14 |
366 | PT INDOCEMENT PLANT 6 | Repair Castable at Suspension Preheater | Jul 14 |
367 | PT INDOCEMENT PLANT 9 | Repair Insulation at Inlet side, oulet side dan North side Area | Jul 14 |
368 | PT INDOCEMENT PLANT 8 | Repair Castable at Suspension Preheater | Jun 14 |
369 | PT INDOCEMENT PLANT 7 | Repair Castable at Suspension Preheater | Jun 14 |
370 | PT INDOCEMENT PLANT 9 | CastableWork at Cyclone , Calciner & Cooler | Jun 14 |
371 | PT INDOCEMENT PLANT 10 | Repair Insulation at Stabilizer Area | May 14 |
372 | PT INDOCEMENT QQ PT HWI | Replace Castable To Brick at Cyclone , C1-2 & C2-2 | May 14 |
373 | PT CATURELANG PERKASA | Supply Material & Installation of Insulation at LP, HP & Boiler (Shut Down) PT. Pertamina Talisman Jambi-Merang | Mar 14 |
374 | PT INDOCEMENT PLANT 9 | Repair Insulation at Stabilizer Area | Mar 14 |
375 | PT INDOCEMENT PLANT 11 | Repair Castable at Grate Cooler | Feb 14 |
376 | PT INDOCEMENT PLANT 7 | Repair Castable at Grate Cooler | Jan 14 |
377 | PT INDOCEMENT PLANT 6 | Repair Castable at Grate Cooler | Jan 14 |
378 | PT BANGUN SARANA BAJA | Repair Refractory at Soaking Zone of Reheating Furnace | Jan 14 |
379 | PT INDOCEMENT PLANT 10 | Repair Castable at Suspension Preheater & Cooler | Oct 13 |
380 | PT INDOCEMENT PLANT 9 | Repair Castable at Cyclone C-1, Side Wall Cooler & Horse Shoe IKN | Sep 13 |
381 | PT INDOCEMENT PLANT 11 | Repair Castable at Tertiary Air Duct (TAD) | Jul 13 |
382 | PT BANGUN SARANA BAJA | Repair Skid Rail of Reheating Furnace | Apr 13 |
383 | PT INDOCEMENT PLANT 6 | Repair Castable at Tertiary Air Duct (TAD) | Apr 13 |
384 | PT INDOCEMENT PLANT 9 | Repair Castable at Suspension Preheater & Cooler | Mar 13 |
385 | PT INDOCEMENT PLANT 7 | Refractory installation of Cyclone and Preheater | Feb 13 |
386 | PT INDOCEMENT PLANT 10 | Repair Castable, Precast Curb Cooler, Horse Shoe and KOH | Feb 13 |
387 | PT LONTAR PAPYRUS PULP QQ PT HWI | Repair Block Burner Of Tissue Drying Furnace | Nov 12 |
388 | PT INDOCEMENT PLANT 9 | Horse Shoe Relining Castable | Oct 12 |
389 | PT BEKAERT INDONESIA | ReliningCover Tunnel Furnace | Oct 12 |
390 | PT PUPUK KUJANG-CIKAMPEK QQ PT HWI | Relining Refractories Translation Reformer A-101-B | Sep 12 |