| NO |
CLIENT |
PROJECT DESCRIPTION |
YEAR |
| 1 |
PT. MERDEKA TSINGSHAN INDONESIA |
Refractory installation Area Roaster 2 |
Feb 25 |
| 2 |
PT APP PURINUSA EKAPERSADA |
CASTABLE;1400deg.C,7N/mm2,CREAM,25kg/BAG |
Feb 25 |
| 3 |
PT. LONTAR PAPYRUS PULP& PAPER |
CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b |
Feb 25 |
| 4 |
PT. LONTAR PAPYRUS PULP& PAPER |
Refractory Work Shutdown MB#24 Jan 25 |
Feb 25 |
| 5 |
PT INDOCEMENT ITP Plant 14 |
Supply Castable RSP 60 G, RSP 60, dan RSP 13 |
Feb 25 |
| 6 |
PT INDOCEMENT TUNGGAL PRAKARSA Tbk |
Supply Ceramic Paper Cerawil®, Density=200kg/m³, ≤1260°C, T3mm×W610mm×L20m |
Feb 25 |
| 7 |
PT. MERDEKA TSINGSHAN INDONESIA |
Jasa Instalasi Castable ESP Flue Gas |
Feb 25 |
| 8 |
PT INDOCEMENT ITP Plant 9 |
Supply Castable RSP 80T |
Feb 25 |
| 9 |
PT. ANTAM Tbk |
Supply Low Cement Castable Refractory 60 Ton |
Feb 25 |
| 10 |
PT. ANTAM Tbk |
Supply Low Cement Castable Refractory 60 Ton |
Jan 25 |
| 11 |
PT. ANTAM Tbk |
Supply Low Cement Castable Refractory 60 Ton |
Jan 25 |
| 12 |
PT. ANTAM Tbk |
Supply Low Cement Castable Refractory 60 Ton |
Jan 25 |
| 13 |
PT. LONTAR PAPYRUS PULP& PAPER |
Refractory Work Shutdown MB#1,2 & PCB 24 |
Jan 25 |
| 14 |
PT. LONTAR PAPYRUS PULP& PAPER |
CASTABLE;1037deg.C,2.07Kg/cm2,GREY,25Kg |
Des 24 |
| 15 |
PT APP PURINUSA EKAPERSADA |
Supply Fire Brick |
Des 24 |
| 16 |
PT. LONTAR PAPYRUS PULP& PAPER |
CASTABLE;1037deg.C,2.07Kg/cm2,GREY,25Kg |
Des 24 |
| 17 |
PT.PINDO DELI PULP AND PAPER MILLS |
CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b |
Des 24 |
| 18 |
PT TOBA PULP LESTARI Tbk |
Supply Castable Mix RSP 75, RKP LW 1200 R dan RSP 96 |
Des 24 |
| 19 |
PT PHOENIX RESOURCES INTERNAT1ONAL |
Supply Castable Mlx MIXER-300 |
Des 24 |
| 20 |
PT PHOENIX RESOURCES INTERNAT1ONAL |
Supply Castable Mlx RSP 75, RKP LヽV1200R, RKP 25 SIC, RKP 1700 RAM |
Des 24 |
| 21 |
PT SEMEN BATURAJA Tbk |
CASTABLE HIGH ALUMINA, LOW CEMENT |
Des 24 |
| 22 |
PT INDOCEMENT ITP Plant 9 |
Supply Castable RSP 60 Gdan RSP 80 T |
Des 24 |
| 23 |
PT INDOCEMENT ITP Plant 9 |
Supply Castable RSP 80 T |
Des 24 |
| 24 |
PT INDOCEMENT ITP Plant 12 Tarjun |
Supply Castable RSP 13 dan RSP 60 G |
Des 24 |
| 25 |
PT INDOCEMENT ITP Plant 11 |
Suply Material Ceramic Fiber Cerawil |
Nov 24 |
| 26 |
PT.PINDO DELI PULP AND PAPER MIILLS |
CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b |
Nov 24 |
| 27 |
PT. LONTAR PAPYRUS PULP& PAPER |
Reafractory works RB 1 RB 2 RB 3 ASD 25 |
Nov 24 |
| 28 |
PT. LONTAR PAPYRUS PULP& PAPER |
CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b |
Nov 24 |
| 29 |
PT. VALE INDONESIA |
Supply High Alumina Castable RKP C16EV |
Nov 24 |
| 30 |
PT. MERDEKA TSINGSHAN INDONESIA |
Installation Refractory Area 4304 & 4305 |
Nov 24 |
| 31 |
PT NICHIAS ROCKWOOL INDONESIA |
Supply Castable RSP 96 |
Oct 24 |
| 32 |
PT INDOCEMENT ITP Plant 16 Maros |
Suply Material Ceramic Fiber Cerawil dan Ceramic Fiber Blanket |
Oct 24 |
| 33 |
PT NUSANTARA TECHNIC INDONESIA |
Supply Castable RKP C 16 R |
Oct 24 |
| 34 |
PT. MERDEKA TSINGSHAN INDONESIA |
Installation Cost AIM Project Morowali |
Oct 24 |
| 35 |
PT. LONTAR PAPYRUS PULP& PAPER |
Refractory Work Shutdown PCB & lOOPSEAL MB#4 |
Sep 24 |
| 36 |
PT. LONTAR PAPYRUS PULP& PAPER |
Refractory work shutdown MB#3 Sept 2024 |
Sep 24 |
| 37 |
PT. MERDEKA TSINGSHAN INDONESIA |
Refractory Work on Flue Gas Pipeline |
Sep 24 |
| 38 |
PT INDONESIA ASAHAN ALUMINIUM |
Pergantian Refractory Lining MF 710 |
Sep 24 |
| 39 |
APP SINARMAS |
Castable, Firebrick |
Sep 24 |
| 40 |
PT. GARVA BERKAT USAHA |
Supply Castable RSP-80 |
Aug 24 |
| 41 |
PT. LONTAR PAPYRUS PULP& PAPER |
Refractory Work Shutdown MB#23&24 Jul24 |
Aug 24 |
| 42 |
PT. LONTAR PAPYRUS PULP& PAPER |
Refrac. Work Shutdown MB#1,2 & PCB Jul24 |
Aug 24 |
| 43 |
PT CEMINDO GEMILANG |
Castable and Refractory Anchors |
Aug 24 |
| 44 |
PT TRUBAJAGA CITA |
Pekerjaan Fabrikasi dan Jasa Insulation untuk Proyek OKI#2 Recovery Boiler, Vacuum Evaporator dan Fiber Line |
Jul 24 |
| 45 |
PT TRUBAJAGA CITA |
Pekerjaan Pemasangan Refractory Proyek PT Cikarang Listrindo Babelan – Bekasi |
Jul 24 |
| 46 |
PT TRUBAJAGA CITA |
Pekerjaan Pemasangan Isolasi dan Suplai Material PT Cikarang Listrindo Babelan – Bekasi |
Jun 24 |
| 47 |
PT INDAHKIAT PULP & PAPER Tbk |
CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b |
Jun 24 |
| 48 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory Work RB#2 Unplan Shutdown 24 |
Jun 24 |
| 49 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory work shutdown MB#3 Mei 2024 |
Jun 24 |
| 50 |
PT ANTAM |
Supply Refractory Castable 30 Ton |
Jun 24 |
| 51 |
PT ANTAM |
Supply Castable Mix Retractory |
May 24 |
| 52 |
PT INDAHKIAT PULP & PAPER Tbk |
CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b |
May 24 |
| 53 |
PT INDAHKIAT PULP & PAPER Tbk |
CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b |
May 24 |
| 54 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b |
May 24 |
| 55 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory Work Shutdown MB#22 & 23 April |
May 24 |
| 56 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b |
May 24 |
| 57 |
PT INDOCEMENT ITP Plant 02 Citeureup |
KSD – Castable For Grate Cooler P11 Area Franco Citeureup RSP 80 T dan RSP 60 G |
Apr 24 |
| 58 |
PT INDOCEMENT ITP Plant 02 Citeureup |
KSD – Insulation For Refractory Job Kiln P11 RSP 13 |
Apr 24 |
| 59 |
PT INDOCEMENT ITP Plant 03 Cirebon |
Supply Castable RSP 80 T |
Apr 24 |
| 60 |
PT INDOCEMENT ITP Plant 03 Cirebon |
Supply Castable RSP 60 G dan RSP 80 T |
Apr 24 |
| 61 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refactory Work Shutdown PCB & MB#24 |
Mar 24 |
| 62 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory Work RB#1, RB#2 ASD 2024 |
Mar 24 |
| 63 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refactory Work Shutdown MB#22,23 Feb 24 |
Mar 24 |
| 64 |
PT PARAMITRA GUNAKARYA CEMERLANG |
CASTABLE;1400deg.C,7N/mm2,CREAM,25kg/BAG |
Mar 24 |
| 65 |
PT DIAN SWASTATIKA SENTOSA, TBK |
CASTABLE;1650deg.C,1000kg/cm2,GREY,50kg/ |
Feb 24 |
| 66 |
PT INDAHKIAT PULP & PAPER Tbk |
CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b |
Feb 24 |
| 67 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
REFRACTORY WORK SHUTDOWN MB#23 15-16 JAN24 |
Feb 24 |
| 68 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
SANDSITIRIZED SHUTDOWN MB#23 16-18 JAN24 |
Feb 24 |
| 69 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
ADD. REFRACTORY WORK SD MB#24 7-23 JAN 24 |
Feb 24 |
| 70 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
REFRACTORY WORK SHUTDOWN MB#24 JAN 2024 |
Feb 24 |
| 71 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory Shutdown PCB Tgl 23 ~25 Jan24 |
Feb 24 |
| 72 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory Work SD RB#1 27 Jan~05 Feb 24 |
Feb 24 |
| 73 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory Work ShutDn MB#24 26~29 Des23 |
Feb 24 |
| 74 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory Work Shutdown RB#2 Januari 24 |
Feb 24 |
| 75 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
RefractoryWork SD MB#21,MB#23 03~05Jan24 |
Feb 24 |
| 76 |
PT MERDEKA TSINGSHAN INDONESIA |
SERVICE, PRELIMINARIES |
Feb 24 |
| 77 |
PT MERDEKA TSINGSHAN INDONESIA |
Additional Refractory Instalation |
Feb 24 |
| 78 |
PT MERDEKA TSINGSHAN INDONESIA |
Refractory Castable RSP 60G |
Feb 24 |
| 79 |
PT SEMEN BATURAJA (PERSERO) Tbk |
CASTABLEHIGH ALUMINA (MIN 80%), LOW CEMENT |
Feb 24 |
| 80 |
PT INDOCEMENT PLANT 14 |
Supply Material Castable |
Jan 24 |
| 81 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b |
Jan 24 |
| 82 |
PT MERDEKA TSINGSHAN INDONESIA |
Installation Refractory Acid Brick for TNK 001 & TNK 002 |
Jan 24 |
| 83 |
PT MERDEKA TSINGSHAN INDONESIA |
Supply material Sodium Silicate – AIM project |
Jan 24 |
| 84 |
PT MERDEKA TSINGSHAN INDONESIA |
Add Anchor Refractory Ducting Tail Kiln to Settling Chamber |
Jan 24 |
| 85 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory Work Shutdown PCB Desember 23 |
Jan 24 |
| 86 |
PT OKI Pulp & Paper Mills |
INS.BLANKET;C.FIBRE,130KG/M3,25T,610W,72 |
Jan 24 |
| 87 |
PT MERDEKA TSINGSHAN INDONESIA |
Supply material Sodium Silicate – AIM project |
Jan 24 |
| 88 |
PT MERDEKA TSINGSHAN INDONESIA |
Add Anchor Refractory Ducting Tail Kiln to Settling Chamber |
Jan 24 |
| 89 |
PT INDOCEMENT PLANT 1 |
Supply Material Castable |
Jan 24 |
| 90 |
PT INDOCEMENT PLANT 2 |
Supply Material Castable |
Jan 24 |
| 91 |
Doosan Heavy Industries & Construction Co , Ltd Jakarta Representative Office |
Scaffolding Erection Work(including Required Material Supply) |
Des 23 |
| 92 |
Doosan Heavy Industries & Construction Co , Ltd Jakarta Representative Office |
Insulation Material Supply Work |
Des 23 |
| 93 |
Doosan Heavy Industries & Construction Co , Ltd Jakarta Representative Office |
Insulation Application Work Muara Tawar Combined Cycle Power Plant Block 2, 3 & 4 Add-on |
Des 23 |
| 94 |
PT INDOCEMENT PLANT 16 |
CASTABLEWORK OLEH PT. RGD SELAMA KILN OVERHAUL P16 DESEMBER 2023 |
Des 23 |
| 95 |
PT MERDEKA TSINGSHAN INDONESIA |
Supply anchor refractory area Ducting to kiln |
Des 23 |
| 96 |
PT MERDEKA TSINGSHAN INDONESIA |
Supply Material Ceramic Board |
Des 23 |
| 97 |
PT MERDEKA TSINGSHAN INDONESIA |
AIM – Additional Refractory Work of PO6864 |
Des 23 |
| 98 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory W RB#1 & RB#2 SD 05~18 Okt 23 |
Nov 23 |
| 99 |
PT MERDEKA TSINGSHAN INDONESIA |
Supply Refractory castable Refractory, Anchor, Ceramic Rope dan Ceramic Paper – Area Outlet, Pipe, End Of Kiln Flue Gas Outlet Pipe |
Nov 23 |
| 100 |
PT MERDEKA TSINGSHAN INDONESIA |
Supply Refractory castable Refractory, Anchor, Ceramic Fiber board dan Ceramic Paper – Area Ducting Kiln |
Nov 23 |
| 101 |
PT ANTAM |
Supply Ceramic Blanket |
Oct 23 |
| 102 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory SD PCB,MB#21 & MB#22 Agust 23 |
Oct 23 |
| 103 |
PT MERDEKA TSINGSHAN INDONESIA |
Installation Refractory Area Head Ducting Kiln to Ring Cooler |
Oct 23 |
| 104 |
PT MERDEKA TSINGSHAN INDONESIA |
Supply Material RSP 80 |
Sep 23 |
| 105 |
PT MERDEKA TSINGSHAN INDONESIA |
Supply Material RSP 30 T & Ceramic Paper- Area Flue Gas Pipe |
Sep 23 |
| 106 |
PT MERDEKA TSINGSHAN INDONESIA |
Supply Material Ceramic Paper 3mm 100 Roll Area Cooling Tower |
Sep 23 |
| 107 |
PT TRUBAJAGA CITA |
Pekerjaan & Supply Material Painting & Sandblasting untuk EPC Of Upgrading Sejorong Fresh Water Pipeline System – PT Amman Mineral Nusa Tenggara, Sumbawa Barat |
Sep 23 |
| 108 |
PT TRUBAJAGA CITA |
Jasa Pekerjaan Painting External Flange Spool Joint and Touchup Painting Body Damage untuk EPC, reroute of 54 inch sea water line and 12 inch fresh water line at concentrator – PT Amman Mineral Nusa Tenggara, Sumbawa Barat |
Sep 23 |
| 109 |
PT WIJAYA KARYA (Persero) Tbk |
Pekerjaan Install Refractories Wing Walls (superheater) & Combustion Chamber, Lower Walls #2 (phase 1) – PT Wijaya Karya (Persero) Tbk |
Sep 23 |
| 110 |
PT MERDEKA TSINGSHAN INDONESIA |
Supply Refractory Castable For Air Mixing Chamber |
Sep 23 |
| 111 |
PT MERDEKA TSINGSHAN INDONESIA |
Installation Refractory For Area Flue Gas Outlet |
Sep 23 |
| 112 |
PT MERDEKA TSINGSHAN INDONESIA |
Installation Refractory For Area Air Mixing Chamber |
Aug 23 |
| 113 |
PT MERDEKA TSINGSHAN INDONESIA |
Supply Anchor Refractory |
Aug 23 |
| 114 |
PT MERDEKA TSINGSHAN INDONESIA |
Installation Refractory For Dome Head Roaster Train 2 |
Aug 23 |
| 115 |
PT MERDEKA TSINGSHAN INDONESIA |
Installation Insulation Pipe For Chain Grate |
Aug 23 |
| 116 |
PT MERDEKA TSINGSHAN INDONESIA |
Installation Refractory For Acid Proof Ceramic Tile For Lower Sheel |
Aug 23 |
| 117 |
PT MERDEKA TSINGSHAN INDONESIA |
Installation Refractory For Area Tower Packing. Product Acid Cooler & LSB Casing |
Aug 23 |
| 118 |
PT MERDEKA TSINGSHAN INDONESIA |
Installation Refractory For Area Chloride |
Aug 23 |
| 119 |
PT MERDEKA TSINGSHAN INDONESIA |
Installation Refractory for area cooling tower |
Aug 23 |
| 120 |
PT MERDEKA TSINGSHAN INDONESIA |
Supply Refractory Castable |
Aug 23 |
| 121 |
PT MERDEKA TSINGSHAN INDONESIA |
Installation Refractory For Area Air Mixing Chamber |
Aug 23 |
| 122 |
PT MERDEKA TSINGSHAN INDONESIA |
Supply Mortar High Strengh |
Aug 23 |
| 123 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory SD MB#23 & MB#24 15~28.06.23 |
Aug 23 |
| 124 |
PT INDOCEMENT PLANT 3 |
CASTABLEWORK OLEH PT. RGD SELAMA KILN OVERHAUL P3 AGUSTUS 2023 |
Aug 23 |
| 125 |
PT INDOCEMENT PLANT 14 |
CASTABLEWORK OLEH PT. RGD SELAMA KILN OVERHAUL P14 JULI 2023 |
Jul 23 |
| 126 |
PT MERDEKA TSINGSHAN INDONESIA |
Supply Ceramic Fiber Blanket |
Jul 23 |
| 127 |
PT MERDEKA TSINGSHAN INDONESIA |
Supply Ceramic Paper |
Jul 23 |
| 128 |
PT INDAHKIAT PULP & PAPER Tbk |
CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b |
Jul 23 |
| 129 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b |
Jul 23 |
| 130 |
PT MERDEKA TSINGSHAN INDONESIA |
CastableFor Chain Grate Refractory |
Jul 23 |
| 131 |
PT SEAGULL COOLING TOWER |
Pekerjaan Installation Insulation Piping & Ducting Tissue Machine 14.1, 14.2, 14.3 and 14.4 |
Jul 23 |
| 132 |
PT TRUBAJAGA CITA |
Pekerjaan Jasa Insulation & Supply Material untuk Proyek RB#11 Replacement IsolasiEconomizer & Boiler Bank di IKPP Perawang |
Jun 23 |
| 133 |
PT MERDEKA TSINGSHAN INDONESIA |
Installation Refractory For Area Grate Chain |
Jun 23 |
| 134 |
PT MERDEKA TSINGSHAN INDONESIA |
Installation Refractory For Area Streamline Dry Section |
Jun 23 |
| 135 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory Work RB#1 & RB#2 ASD23 (Add) |
Jun 23 |
| 136 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory Work ShutDwn MB#23 13~24 Mei23 |
Jun 23 |
| 137 |
PT INDOCEMENT TUNGGAL PRAKARSA Tbk |
Perjanjian Pengadaan dan Pemasangan Castable di semua plant di citeureup, palimanan dan tarjun plant site |
May 23 |
| 138 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory Work RB#1 & RB#2 ASD 2023 |
May 23 |
| 139 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory Work Shutdown PCB 21~29 Mar23 |
May 23 |
| 140 |
PT ENVIROMATE TECHNOLOGY INTERNATIONAL |
EPC Pembangunan Pabrik Minyak Goreng 2.500 TPD |
Apr 23 |
| 141 |
PT HUTAMA KARYA (Persero) |
Additional Insulation Desalination, Pipe Rack #2, HRSG #2.1 dan HRSG #2.2 |
Apr 23 |
| 142 |
PT HUTAMA KARYA (Persero) |
Insulation Works For Block#3 And Block #4 (HRSG,BOP/Piperack & Turbine Package) |
Apr 23 |
| 143 |
PT TRUBAJAGA CITA |
Pekerjaan Wrapping Pipe 16′ & 10′ untuk Proyek EPC, AND UPGRADING SEJORONG FRESH WATER PIPELINE SYSTEM PT. AMMAN MINERAL, NTT – SUMBAWA BARAT |
Apr 23 |
| 144 |
PT INDOCEMENT PLANT 11 |
CASTABLEWORK OLEH PT. RGD SELAMA KILN OVERHAUL P11 APRIL 2023 |
Mar 23 |
| 145 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory Shutdown MB#24 10~19 Feb 23 |
Mar 23 |
| 146 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory Work SD MB#23 11 sd 18 Des 22 |
Mar 23 |
| 147 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory Shutdown MB#24 01~07 Jan 23 |
Mar 23 |
| 148 |
PT INDOCEMENT PLANT 11 |
CASTABLEWORK OLEH PT. RGD SELAMA KILN OVERHAUL P11 APRIL 2023 |
Mar 23 |
| 149 |
PT INDOCEMENT PLANT 11 |
CASTABLEWORK OLEH PT. RGD SELAMA KILN OVERHAUL P11 APRIL 2023 |
Mar 23 |
| 150 |
PT INDOCEMENT PLANT 3 |
CASTABLEWORK OLEH PT. RGD SELAMA KILN OVERHAUL P3 FEBRUARI 2023 |
Feb 23 |
| 151 |
PT ARAFURA SURYA ALAM (ASA) – J Resources |
Pekerjaan & Supply Material Painting & Sandblasting untuk Project Gold Process Plant, Kotabunan, Bolaan, Magondow Timur – Sulawesi Utara |
Feb 23 |
| 152 |
PT INDAHKIAT PULP & PAPER Tbk |
INS.BLANKET;R.WOOL,100kg/m3,50T,50.8D,10 dan INS.BLANKET;R.WOOL,100kg/m3,50T,76.2D,10 |
Feb 23 |
| 153 |
PT CATURELANG PERKASA |
Supply Material & Installation Hot Insulation Piping & Tank |
Feb 23 |
| 154 |
PT CATURELANG PERKASA |
TAR Open Insullation Valve and Pipe |
Jan 23 |
| 155 |
PT PINDODELI PULP & PAPER Tbk |
CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b |
Jan 23 |
| 156 |
PT ASIA PACIFIC RAYON |
New Insulation Cystallizer tank Viscose |
Des 22 |
| 157 |
PT INDAHKIAT PULP & PAPER Tbk |
MB21 Shutdown, Insulation job |
Des 22 |
| 158 |
PT MERDEKA TSINGSHAN INDONESIA |
REFRACTORY, (Acid Brick Lininng Tower & Kiln Area) – SMELTER MOROWALI ACID IRON METAL (AIM) PROJECT, PT. MERDEKA TSINGSHAN INDONESIA – Kawasan Industri Morowali – Sulawesi Tengah |
Des 22 |
| 159 |
PT MERDEKA TSINGSHAN INDONESIA |
REFRACTORY & INSULATION INSTALLATION, (Roaster & Water Heater Boiler Area) and – SMELTER MOROWALI ACID IRON METAL (AIM) PROJECT, PT. MERDEKA TSINGSHAN INDONESIA – Kawasan Industri Morowali – Sulawesi Tengah |
Des 22 |
| 160 |
PT OKI PULP & PAPER MILLS Tbk |
INS.BLANKET;R.WOOL+WIRE,80KG/CM3,100T,90 |
Des 22 |
| 161 |
PT DIAN SWASTATIKA SENTOSA, Tbk |
CASTABLE;1400deg.C,7N/mm2,CREAM,25kg/Bag |
Nov 22 |
| 162 |
PT INDAHKIAT PULP & PAPER Tbk |
MB 21 Repair isolasi |
Nov 22 |
| 163 |
PT INDAHKIAT PULP & PAPER Tbk |
TG 25 SD, Insulation Job |
Nov 22 |
| 164 |
PT INDAHKIAT PULP & PAPER Tbk |
INS.BLANKET;C.FIBRE,130kg/m3,25T,610W,72 |
Nov 22 |
| 165 |
PT INDAHKIAT PULP & PAPER Tbk |
MB12.Repair support coloumb conv.11.ke-2 |
Nov 22 |
| 166 |
PT INDAHKIAT PULP & PAPER Tbk |
MB13.Repair support coloum mixhopper k-3 |
Nov 22 |
| 167 |
PT INDAHKIAT PULP & PAPER Tbk |
MB12.Conv.25,Replace frame conveyor |
Nov 22 |
| 168 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory Shutdown MB#23 November 22 |
Nov 22 |
| 169 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory ShutD MB23 & MB24 05~15 Okt22 |
Nov 22 |
| 170 |
PT TRUBAJAGA CITA |
PROYEK EPC, AND UPGRADING SEJORONG FRESH WATER PIPELINE SYSTEM PT. AMMAN MINERAL, NTT – SUMBAWA BARAT |
Oct 22 |
| 171 |
PT INDAHKIAT PULP & PAPER Tbk |
MB13;Support mix Hopper bgn tngh corosiv |
Oct 22 |
| 172 |
PT TRUBAJAGA CITA |
Amandemen-1 Pekerjaan Jasa Insulation dan Painting OSBL dan ISBL Pindodeli Pulp dan Paper Mild – Karawang – Jawa Barat |
Sep 22 |
| 173 |
PT RIAU ANDALAN PULP AND PAPER |
Insulation Tape, Thermal, ANY;100X25000X3MM-GFRP-5 |
Sep 22 |
| 174 |
PT SEMEN BATURAJA |
CASTABLEHIGH ALUMINA, CASTABLE,LOW ALUMINA, NEEDLE EEL SUS 310, ANCHOR DLL |
Sep 22 |
| 175 |
PT DIAN SWASTATIKA SENTOSA, Tbk |
CASTABLE;1400deg.C,7N/mm2,CREAM,25kg/BAG |
Sep 22 |
| 176 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory Work SD PCB 20Agust~04Sept 22 |
Sep 22 |
| 177 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory maintenance service boiler MB24 & MB23 |
Sep 22 |
| 178 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory maintenance service boiler MB#23 |
Aug 22 |
| 179 |
PT INDAHKIAT PULP & PAPER Tbk |
CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b |
Aug 22 |
| 180 |
PT INDAHKIAT PULP & PAPER Tbk |
S.fuel ; Reposision tail pulley conv 14 |
Aug 22 |
| 181 |
PT INDAHKIAT PULP & PAPER Tbk |
repair support coloumb |
Jul 22 |
| 182 |
PT INDAHKIAT PULP & PAPER Tbk |
repair support coloumb mixhopper |
Jul 22 |
| 183 |
PT INDAHKIAT PULP & PAPER Tbk |
Castable & Firebrick |
Jul 22 |
| 184 |
PT HUTAMA KARYA (Persero) |
INSULATION AREA STEAM SYSTEM AND STEAM BYPASS SYSTEM #2 PART 3, For Project MUARA TAWAR COMBINED CYCLE POWER PLANT BLOCK 2, 3 & 4 Add-On PROJECT, Number: 228/SPP/HK-RGD/CCPP-MT/VII/2022 |
Jul 22 |
| 185 |
PT HUTAMA KARYA (Persero) |
INSULATION AREA AUX STEAM SYSTEM #2,STEAM BYPASS SYSTEM & COMMON PART 12, For Project MUARA TAWAR COMBINED CYCLE POWER PLANT BLOCK 2, 3 & 4 Add-On PROJECT, Number:226/SPP/HK-RGD/CCPP-MT/VII/2022 |
Jul 22 |
| 186 |
PT HUTAMA KARYA (Persero) |
INSULATION For Project MUARA TAWAR COMBINED CYCLE POWER PLANT BLOCK 2, 3 & 4 Add-On PROJECT, Amandemen – 1. Number: 217/AMD-1/SPP/HK-RGD/CCPP-MT/VII/2022 |
Jul 22 |
| 187 |
PT HUTAMA KARYA (Persero) |
INSULATION AREA AUX STEAM SYSTEM #2,STEAM BYPASS SYSTEM & COMMON PART 1, For Project MUARA TAWAR COMBINED CYCLE POWER PLANT BLOCK 2, 3 & 4 Add-On PROJECT, Number: 224/SPP/HK-RGD/CCPP-MT/VI/2022 |
Jun 22 |
| 188 |
PT HUTAMA KARYA (Persero) |
PROYEK Add-On PUSAT LISTRIK TENAGA GAS UAP MUARA TAWAR BLOK 2, 3 & 4 |
Jun 22 |
| 189 |
PT TRUBAJAGA CITA |
Amandemen-1 Pekerjaan Jasa Insulation & Supply Material untuk Proyek P11 PT ITP Indocement Citeureup |
Jun 22 |
| 190 |
PT SEAGULL COOLING TOWER |
Installation Insulation Piping Tissue Machine 14.1, 14.2, 14.3 and 14.4 |
Jun 22 |
| 191 |
PT SEMEN BATURAJA (PERSERO) Tbk |
CASTABLEHIGH ALUMINA, CASTABLE,LOW ALUMINA, NEEDLE EEL SUS 310, ANCHOR DLL |
Jun 22 |
| 192 |
PT PINDODELI PULP AND PAPER MILLS |
Pasang line steam Silo tm 31 |
Jun 22 |
| 193 |
PT PINDODELI PULP AND PAPER MILLS |
Add linesteam silo tank tm 34 |
Jun 22 |
| 194 |
PT PINDODELI PULP AND PAPER MILLS |
Add linesteam silo tank tm 32 |
Jun 22 |
| 195 |
PT PINDODELI PULP AND PAPER MILLS |
Add linesteam silo tank tm 33 |
Jun 22 |
| 196 |
PT INDAHKIAT PULP & PAPER Tbk |
RB-11 Dism’t & Install Insulation Wall B |
Jun 22 |
| 197 |
PT INDAHKIAT PULP & PAPER Tbk |
TG3 Hot insulation of HP steam to TG3 |
Jun 22 |
| 198 |
PT INDOCEMENT PLANT 9 |
CASTABLEWORK OLEH PT. RGD SELAMA KILN OVERHAUL P9 JUNI 2022 |
Jun 22 |
| 199 |
PT TRUBAJAGA CITA |
Pekerjaan Jasa Insulation & Supply Material untuk Proyek RB#11 Replacement Boiler Bank di IKPP Perawang |
Jun 22 |
| 200 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory maintenance service boiler MB#23 |
May 22 |
| 201 |
PT TRUBAJAGA CITA |
Pekerjaan Jasa Instalasi Ducting HVAC Untuk Proyek TM14 – PT. Oki Pulp And Paper – Palembang – Sumatera Selatan C1103 |
May 22 |
| 202 |
PT HUTAMA KARYA (Persero) |
INSULATION For Project MUARA TAWAR COMBINED CYCLE POWER PLANT BLOCK 2, 3 & 4 Add-On PROJECT, Number: 217/SPP/HK-RGD/CCPP-MT/V/2022 |
May 22 |
| 203 |
PT TRUBAJAGA CITA |
Pekerjaan Jasa Insulation & Painting OSBL & ISBL untuk Pindo Deli Pulp Paper Mild, Kerawang Jawa Barat C2103 |
Apr 22 |
| 204 |
PT INDAHKIAT PULP & PAPER Tbk |
CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b |
Apr 22 |
| 205 |
PT INDAHKIAT PULP & PAPER Tbk |
MB#21 S/D Dismantle & install insulation |
Apr 22 |
| 206 |
PT INDAHKIAT PULP & PAPER Tbk |
INSULATION,REPLACE;WATER CHILLED AHU CS6 |
Apr 22 |
| 207 |
PT INDAHKIAT PULP & PAPER Tbk |
MB12; S/D Repair insulation water wall |
Apr 22 |
| 208 |
PT PINDODELI PULP AND PAPER MILLS |
CASTABLE;1600deg.C,100kg/cm2,GREY,25kg/b |
Apr 22 |
| 209 |
PT INDAHKIAT PULP & PAPER Tbk |
ASD P-9, Repair isolasi during shutdown |
Apr 22 |
| 210 |
PT INDOCEMENT PLANT 11 |
Repair Castable at TAD, KOH P 11 |
Mar 22 |
| 211 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory maintenance service boiler MB#21 |
Mar 22 |
| 212 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory maintenance service boiler RB#21 |
Feb 22 |
| 213 |
PT JUHDISAKTI ENGINEERING |
Pekerjaan Pemasangan dan Inolasi Tangki |
Feb 22 |
| 214 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#23 |
Feb 22 |
| 215 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#24 |
Feb 22 |
| 216 |
PT INDAHKIAT PULP & PAPER Tbk |
MB23, SD plugging APH SAF & PAF |
Jan 22 |
| 217 |
PT INDAHKIAT PULP & PAPER Tbk |
FL-8 Hot Insulation Effluent Heat Recovery |
Jan 22 |
| 218 |
PT KRAKATAU STEEL |
Jasa Perbaikan Refractory Reactor C1 & C2 ARP-CRM |
Des 21 |
| 219 |
PT INDAHKIAT PULP & PAPER Tbk |
WP 2; Rewelding Barking Plate Rotor No. 1, 2, 3, 4, 5, 6, 7 & 8 & Repair Plate Chute to Bark Conv ( Add ) |
Des 21 |
| 220 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#24 |
Des 21 |
| 221 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#22 & MB#21 |
Des 21 |
| 222 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#24 |
Nov 21 |
| 223 |
PT CATURELANG PERKASA |
Remove and Install Insulation at SK-45, SK-70 During TAR 2021 Activity_SO.4203.3252.XI.21 |
Nov 21 |
| 224 |
PT CATURELANG PERKASA |
Supply and install Hot Insulation Pipe and Valve, Fabrication & Installation hot insulation cond pre heater, modification plate fot JT-VLV & plate from access operation VLV OP 7_SO.4148.3252.XI.21 |
Nov 21 |
| 225 |
PT CATURELANG PERKASA |
Supply and install Hot Insulation Pipe and Valve, TAR Open Insulation Valve and Pipe_SO.4147.3252.XI.21 |
Nov 21 |
| 226 |
PT CATURELANG PERKASA |
Supply and install Hot Insulation Pipe and Valve, TAR Support Remove and re-install insulation_SO.4141.3252.XI.21 |
Nov 21 |
| 227 |
PT INDAHKIAT PULP & PAPER Tbk |
PB-2 SOLID FUEL. CUT OFF & DISMANTLE FRMAE CONVEYOR 12 BARK YARD |
Nov 21 |
| 228 |
PT INDAHKIAT PULP & PAPER Tbk |
MB12. CONV 9 REPOTITION HD PULLEY & REPLACE CHUTE CONV 10 |
Nov 21 |
| 229 |
PT INDAHKIAT PULP & PAPER Tbk |
MB12. CONV 8 REPOTITION HD PULLEY & REPLACE CHUTE TO BIN 2 |
Nov 21 |
| 230 |
PT OKI PULP & PAPER MILLS Tbk |
Supply Brick ; 1650DEG.C,250W,300L,103/92.7T |
Oct 21 |
| 231 |
PT PINDODELI PULP AND PAPER MILLS |
SD MB25 Install line cooling water IDF |
Oct 21 |
| 232 |
PT INDAHKIAT PULP & PAPER Tbk |
MB21, Line Sumpit Pump to Cooling tower |
Oct 21 |
| 233 |
PT INDAHKIAT PULP & PAPER Tbk |
PG 2 Hot Insulation For HP Steam Piping F |
Oct 21 |
| 234 |
PT INDAHKIAT PULP & PAPER Tbk |
MB#21install line injection lime stone |
Oct 21 |
| 235 |
PT PINDODELI PULP AND PAPER MILLS |
MB25 Shut Down, Reposisi Line ESP A1 to Ash Silo |
Oct 21 |
| 236 |
PT OKI PULP & PAPER MILLS Tbk |
Supply Fire Brick ;1650deg.C,250W,198L,103/92.7T |
Oct 21 |
| 237 |
PT OKI PULP & PAPER MILLS Tbk |
Supply Fire Brick ;1650deg.C,250W,198L,83/74.5T |
Oct 21 |
| 238 |
PT OKI PULP & PAPER MILLS Tbk |
Supply Fire Brick ;1650deg.C,250W,198L,93/84.5T |
Oct 21 |
| 239 |
PT OKI PULP & PAPER MILLS Tbk |
Supply Fire Brick ;1650DEG.C,250W,300L,103/94.5T |
Oct 21 |
| 240 |
PT OKI PULP & PAPER MILLS Tbk |
Supply Fire Brick ;1650DEG.C,250W,300L,103/92.7T |
Oct 21 |
| 241 |
PT OKI PULP & PAPER MILLS Tbk |
Supply Fire Brick ; 1650deg. C, 250 W, 198L, 103/94.5T |
Oct 21 |
| 242 |
PT LONTAR PAPYRUS PULP & PAPER INDUSTRY |
Refractory maintenance service boiler MB#24 |
Sep 21 |
| 243 |
PT WASAMITRA ENGINEERING |
Refractory Project PLTU Barru 1 X 100 MW |
Sep 21 |
| 244 |
PT INDAHKIAT PULP & PAPER, Tbk |
PPM 6 REPAIR BASE PLATE JUMBO ROLL ( 2 UNIT ) |
Sep 21 |
| 245 |
PT INDAHKIAT PULP & PAPER, Tbk |
MB25,Wall SCrew E,Replace Screw |
Aug 21 |
| 246 |
PT INDAHKIAT PULP & PAPER, Tbk |
MB25, Install Hose Roll For Cleaning Bunker, Coal Feeder, Bottom Ash Loopseal, ESP, Conveyor 11 & Secondary Crusher) |
Jul 21 |
| 247 |
PT INDAHKIAT PULP & PAPER, Tbk |
MB24, Install Hose Roll For Cleaning Bunker, Coal Feeder, Bottom Ash Loopseal & ESP |
Jul 21 |
| 248 |
PT INDAHKIAT PULP & PAPER, Tbk |
MB23/MB24, Replace Plate Under Belt Coal Conveyor 01A & 01B. (Audit MHO And Safety) |
Jul 21 |
| 249 |
PT INDAHKIAT PULP & PAPER, Tbk |
MB23/MB24, Replace Plate Under Belt Coal Conveyor 03A & 03B. (Audit MHO And Safety) |
Jul 21 |
| 250 |
PT INDAHKIAT PULP & PAPER, Tbk |
MB23/MB24, Replace Plate Under Belt Coal Conveyor 02A & 02B. (Audit MHO And Safety) |
Jul 21 |
| 251 |
PT INDOCEMENT PLANT 9 |
Repair Castable at Cooler P 9 |
Jun 21 |
| 252 |
PT INDAHKIAT PULP & PAPER, Tbk |
MB25, New Install Line Pipe Lime Stone from MB26 Silo to SA Lower MB25 |
Jun 21 |
| 253 |
PT INDAHKIAT PULP & PAPER, Tbk |
MB#21 Replace Drag Chain Bark Conveyor 24 |
Jun 21 |
| 254 |
PT INDAHKIAT PULP & PAPER, Tbk |
MB#26 : Shutdown, Replace Wall Screw & Casing (Total Set) |
Jun 21 |
| 255 |
PT INDAHKIAT PULP & PAPER, Tbk |
WP-2 Chip conveyor from chip screen UTC |
May 21 |
| 256 |
PT INDAHKIAT PULP & PAPER, Tbk |
WP2;repair chip conveyor to digester M16 |
May 21 |
| 257 |
PT INDAHKIAT PULP & PAPER, Tbk |
PWP-Repair & Repainting pipe bridge & pipe rack SK 11 to TG 23 |
May 21 |
| 258 |
PT INDAHKIAT PULP & PAPER, Tbk |
WP-2 Chip conveyor to chip pile -1 (M007 |
May 21 |
| 259 |
PT INDAHKIAT PULP & PAPER, Tbk |
WP-8 Repair chip conveyor 3 HHQ |
May 21 |
| 260 |
PT INDAHKIAT PULP & PAPER, Tbk |
WP-2 Chip conveyor to chip pile -2 (M005 |
May 21 |
| 261 |
PT INDAHKIAT PULP & PAPER, Tbk |
WP-2 Chip conveyor to digester |
May 21 |
| 262 |
PT INDAHKIAT PULP & PAPER, Tbk |
WP2:repair chip conveyor M005 |
May 21 |
| 263 |
PT INDAHKIAT PULP & PAPER, Tbk |
WP-2 Chip conveyor 2 to digester (M117) |
May 21 |
| 264 |
PT INDAHKIAT PULP & PAPER, Tbk |
WP-8 Repair Chip Conveyor From Chip Screen HHQ |
May 21 |
| 265 |
PT PURINUSA EKA PERSADA |
REPAIR,FIREBRICK FURNACE BOILER |
May 21 |
| 266 |
PT INDOCEMENT PLANT 14 |
Repair Castable at TAD, Cooler P 14 |
May 21 |
| 267 |
PT INDOCEMENT PLANT 9 |
Installalation Maintenance Refractory Plant 9 – Cirebon |
May 21 |
| 268 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#22 RB#23 |
Apr 21 |
| 269 |
PT INDOCEMENT PLANT 14 |
Project Refractory Plant 14 – Citeureup |
Apr 21 |
| 270 |
PT JURONG ENGINEERING LESTARI |
Insulation Works STG & BOP |
Mar 21 |
| 271 |
PT JURONG ENGINEERING LESTARI |
Insulation Works Stack and Outlet Duct Insulation works for HRSG Unit |
Mar 21 |
| 272 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#21 RB#22 |
Mar 21 |
| 273 |
PT INDOCEMENT PLANT 11 |
Project Refractory Plant 11 – Citeureup |
Feb 21 |
| 274 |
PT LONTAR PAPYRUS PULP & PAPER |
Project PCB Boiler |
Feb 21 |
| 275 |
PT WIJAYA KARYA (Persero) Tbk |
Supply Materials Hot Insulation P4 Project : EPC Storage Tanks Modification And Piping System RDMP RU V-Balikpapan |
Des 20 |
| 276 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#24 |
Des 20 |
| 277 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#22 |
Des 20 |
| 278 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#23_RB#21 |
Des 20 |
| 279 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler RB#3 |
Nov 20 |
| 280 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#23 |
Oct 20 |
| 281 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#24 |
Sep 20 |
| 282 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#23 |
Sep 20 |
| 283 |
PT TRUBAJAYA ENGINEERING |
Additional Insulation Works #2 & #3 For drain piping at pipe rack & steam sampling and piping system at STG Building |
Sep 20 |
| 284 |
PT BARATA INDONESIA (Persero) |
Installastion Service Insulation Boiler Aux Unit 1 – PG Bombana, Sulawesi Tenggara |
Aug 20 |
| 285 |
PT LONTAR PAPYRUS PULP & PAPER |
Project PCB Boiler |
Aug 20 |
| 286 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler RB#2 |
Aug 20 |
| 287 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler RB#1 |
Aug 20 |
| 288 |
PT HARBISON WALKER INDONESIA |
Installation Service at PT. Jui Shin (PT. Semen Garuda) |
Jun 20 |
| 289 |
PT TRUBAJAGA CITA |
Pekerjaan Jasa Insulation & Supply Material area PKS Fuel Feeding System For Boiler Cikarang Listrindo di Babelan, Bekasi Valmet Project |
Jun 20 |
| 290 |
PT TRUBAJAGA CITA |
Pekerjaan Refractory area PKS Fuel Feeding System For Boiler Cikarang Listrindo di Babelan, BekasiValmet Project |
Jun 20 |
| 291 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#24 |
Jun 20 |
| 292 |
PT UNIDEBY KENCANA QQ INDOCEMENT |
Calciner Castable Repair Indocement P14 |
May 20 |
| 293 |
PT MORITA JAPANINDO UTAMA |
Refractory Work For Hot Air Generator AF – 3006 Bantar Gebang – Bekasi |
May 20 |
| 294 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#23 |
Mar 20 |
| 295 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler RB#22 |
Mar 20 |
| 296 |
PT BARATA INDONESIA (Persero) |
Insulation For Main Steam Line and Insulation Boiler and Auxillary – PG Bombana, Sulawesi Tenggara |
Feb 20 |
| 297 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler RB#23 |
Feb 20 |
| 298 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#24 |
Feb 20 |
| 299 |
PT TRUBAJAGA CITA |
Supply and installasi materials InsulationProject P8 – PT ITP (INDOCEMENT) CITEUREUP C-2101 |
Des 19 |
| 300 |
PT WIJAYA KARYA (Persero) Tbk |
Supply materials Insulation project EPC Site Development 5A Proyek RDMP RU-V Balikpapan |
Nov 19 |
| 301 |
PT WIJAYA KARYA (Persero) Tbk |
Supply materials Insulation project EPC Site Development 4A Proyek RDMP RU-V Balikpapan |
Oct 19 |
| 302 |
PT WIJAYA KARYA (Persero) Tbk |
Supply materials Insulation project EPC Site Development 3A Proyek RDMP RU-V Balikpapan |
Oct 19 |
| 303 |
PT WIJAYA KARYA (Persero) Tbk |
Supply materials Insulation project EPC Site Development 2A Proyek RDMP RU-V Balikpapan |
Sep 19 |
| 304 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler RB#22 |
Des 19 |
| 305 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#23 |
Nov 19 |
| 306 |
PT TRUBAJAGA CITA |
Wrappingand Insulation Work at Pindodeli Pulp and Paper Plant, Karawang- Jawa Barat |
Oct 19 |
| 307 |
PT TRUBAJAGA CITA |
Paintingand Sand Blasting Work at Pindodeli Pulp and Paper Plant, Karawang – Jawa Barat |
Sep 19 |
| 308 |
PT ANTAMTbk |
Supply Refarctory Material for Lining Production in Plant Refinery and Casting |
Aug 19 |
| 309 |
PT JURONG ENGINEERING LESTARI |
Insulating Work for New of 4 Units of HRSG Boiler ,Muara Tawar Combined Cycle Power Plant, West Java , Indonesia |
Aug 19 |
| 310 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#22 |
Aug 19 |
| 311 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#24 |
Jul 19 |
| 312 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler RB#1 |
Jul 19 |
| 313 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler RB#2 |
Jun 19 |
| 314 |
PT TRUBAJAYA ENGINEERING |
Painting& Sand Blasting Work at New Power Plant- CFSPP 2×100 MW Project, Kalsel Teng 2 |
Jun 19 |
| 315 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#22 |
Jun 19 |
| 316 |
PT INDOCEMENT QQ PT HWI |
Repair Castable at Grate Cooler |
Jun 19 |
| 317 |
PT KRAKATAU STEEL QQ PT HWI |
Repair Castable of Main Runner – Blast Furnace |
May 19 |
| 318 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#21 |
May 19 |
| 319 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#22 |
May 19 |
| 320 |
PT HANA NUANSA PRATAMA |
Supply and Installation Work of Insulation for HRSG, HP& LP Drum, Deator, Senipah Project, Kalimantan Timur |
May 19 |
| 321 |
PT INDOCEMENT QQ PT HWI |
Repair Castable at Grate Cooler |
May 19 |
| 322 |
PT INDOCEMENT QQ PT HWI |
Repair Castable at Grate Cooler and Tertiery Air Duct |
Apr 19 |
| 323 |
PT JUI SHIN INDONESIA QQ PT HWI |
Repair Castable at Tertier Air Duct and Grate Cooler |
Apr 19 |
| 324 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#22 |
Apr 19 |
| 325 |
PT LONTAR PAPYRUS PULP & PAPER |
Refractory Maintenance Service Boiler MB#23 |
Mar 19 |
| 326 |
PT INDOCEMENT QQ PT HWI |
Repair Castable at Grate Cooler |
Jan 19 |
| 327 |
PT TRUBAJAGA CITA |
Supply & Installation Work to N1 Bag Filter Holcim Job Maintenance Narogong |
Oct 18 |
| 328 |
PT TRUBAJAYA ENGINEERING |
Supply Insulation Material and Accessories for New CFB Power Plant , Project PLTU Kalsel -1 2×100, Tabalong Kalsel |
Aug 18 |
| 329 |
PT TRUBAJAYA ENGINEERING |
ManpowerSupply For Insulation Work Project PLTU Kalsel -1 2x100mx New CFB – Power Plant , Tabalong Kalsel |
Aug 18 |
| 330 |
PT TRUBAJAYA ENGINEERING |
Supply & Installation Work of Insulation to New Tisue Machine Plant of OKI Pulp and Paper, Palembang – Sumatera Selatan |
Jul 18 |
| 331 |
PT KARYASINAR SURYA |
Supply of Insulation Material for Turbin Application of Kalsel -1, 2 x 100 MW New CFB Power Plant, Tabalong Kalsel |
May 18 |
| 332 |
PT TRUBAJAYA ENGINEERING |
Insulation Work of Natural Gas Boiler Project – Chandra Asri Petrochemical, Cilegon Banten |
Feb 18 |
| 333 |
PT TRUBAJAYA ENGINEERING |
Insulation Work at Ash Hopper Project Kalsel -1 2 X 100 MW New CFB Power Plant, Tanjung Tabalong, Kalsel |
Mar 17 |
| 334 |
PT TRUBAJAYA ENGINEERING |
Supply & Installation Work of Insulation with Accessories at RM EP Convertion To Bag Filter Project Plant 10 , Palimanan |
Mar 17 |
| 335 |
PT CATURELANG PERKASA |
Supply & Installation Work of Insulation at Windows Vessel Senoro Project Job PMTS |
Mar 17 |
| 336 |
PT CATURELANG PERKASA |
Insulation Work at Senoro Project Job Pertamina Medco Tomori |
Feb 17 |
| 337 |
PT CATURELANG PERKASA |
Supply & Installation Work of Insulation at Windows Vessel Senoro Project Job |
Jan 17 |
| 338 |
PT SINOMA ENGINEERING INDONESIA |
Insulation Hot Gas Piping Work at 10.000 TPD Brownfield New Cement Plant 14 Project |
Jan 17 |
| 339 |
PT KRAKATAU ENGINEERING |
Pipe Insulation Work at Lubricants Unit of Production Pertamina, UPPJ-Tj Priok, Jakarta |
Okt 16 |
| 340 |
PT TRUBAJAYA ENGINEERING |
Insulation Work For Sinar Mas Group of New Plant Project – OKI PULP & PAPER MILLS, Palembang -South Sumatera |
Jun 16 |
| 341 |
PT TONSCO INTERNATIONAL |
Insulation Work of Piping Area PT. Pertamina Talisman Jambi-Merang |
Jun 16 |
| 342 |
PT INDOCEMENT QQ PT HWI |
Repair Castable at Grate Cooler |
May 16 |
| 343 |
PT INDOCEMENT QQ PT HWI |
Repair Castable at Suspension Preheater |
Apr 16 |
| 344 |
PT WIKA REKAYASA KONSTRUKSI |
Supply and Installation Work of Refractory at CFB-Power Plant, PT. Rayon Utama Makmur Solo |
Apr 16 |
| 345 |
PT SINOMA ENGINEERING INDONESIA |
Insulation Work On Cement Grinding Including Small Duct of TPD Brownfield New Cement Plant 14 Project |
Mar 16 |
| 346 |
PT SINOMA ENGINEERING INDONESIA |
Roof Water Leakage Repair & Cladding Installation For Limestone Storage TPD Brownfield New Cement Plant 14 Project |
Mar 16 |
| 347 |
PT INDOCEMENT QQ PT HWI |
Repair Castable at Suspension Preheater |
Mar 16 |
| 348 |
PT SINOMA ENGINEERING INDONESIA |
Insulation Work On Bag Filter Including Piping Area at 10,000 TPD Brownfield New Cement Plant 14 Project |
Feb 16 |
| 349 |
PT SINOMA ENGINEERING INDONESIA |
Roof & Cladding Installation For Steel Structure Building 10,000 TPD Brownfield New Cement Plant 14 Project |
Jan 16 |
| 350 |
PT INDOCEMENT QQ PT HWI |
Repair Castable at Tertiary Air Duct |
Jan 16 |
| 351 |
PT CATURELANG PERKASA |
Supply Material & Installation of Box Exchanger Insulation at PT. Pertamina Talisman Jambi-Merang |
Des 15 |
| 352 |
PT CATURELANG PERKASA |
Insulation Piping Work at PT. Pertamina Talisman Jambi-Merang |
Aug 15 |
| 353 |
PT PGAS SOLUTION |
Supply and Installation of Insulation Material at Steam Heater Line Project KGJ1- Semarang |
Aug 15 |
| 354 |
PT CATURELANG PERKASA |
Repair Insulation at SKN & PG Gas PT. Pertamina Talisman Jambi-Merang |
Jun 15 |
| 355 |
PT INDOCEMENT PLANT 8 |
Repair Castable Suspension Preheater |
May 15 |
| 356 |
PT TRUBAJAYA ENGINEERING |
Insulation Application TPD Brownfield New Cement Plant Project P14, Citeureup-Bogor |
Apr 15 |
| 357 |
PT INDOCEMENT PLANT 7 |
Repair Castable at Grate Cooler |
Apr 15 |
| 358 |
PT INDOCEMENT PLANT 11 |
Repair Castable at Tertiary Air Duct |
Mar 15 |
| 359 |
PT INDOCEMENT PLANT 6 |
Repair Castable at Grate Cooler |
Mar 15 |
| 360 |
PT KRAKATAU ENGINEERING |
Supply Material & Installation of Insulation at Pertamina, UPPJ Tj.Priok, Jakarta |
Jan 15 |
| 361 |
PT CATURELANG PERKASA |
Supply Material & Installation of Insulation Piping PT.Pertamina Talisman Jambi-Merang |
Dec 14 |
| 362 |
PT REKAYASA ENGINEERING |
Insulation Application of MEPIC Cabot Project – PT. Cabot Indonesia – Cilegon |
Okt 14 |
| 363 |
PT TRUBAJAYA ENGINEERING |
Insulation Application of Sie Mangke T5104 Project – PT. Unilever-Medan |
Sep 14 |
| 364 |
PT INDOCEMENT PLANT 10 |
Repair Castable at Suspension Preaheater, Coller |
Sep 14 |
| 365 |
PT DINUO INDONESIA |
Insulation Work at Piping & Tank Project |
Aug 14 |
| 366 |
PT INDOCEMENT PLANT 6 |
Repair Castable at Suspension Preheater |
Jul 14 |
| 367 |
PT INDOCEMENT PLANT 9 |
Repair Insulation at Inlet side, oulet side dan North side Area |
Jul 14 |
| 368 |
PT INDOCEMENT PLANT 8 |
Repair Castable at Suspension Preheater |
Jun 14 |
| 369 |
PT INDOCEMENT PLANT 7 |
Repair Castable at Suspension Preheater |
Jun 14 |
| 370 |
PT INDOCEMENT PLANT 9 |
CastableWork at Cyclone , Calciner & Cooler |
Jun 14 |
| 371 |
PT INDOCEMENT PLANT 10 |
Repair Insulation at Stabilizer Area |
May 14 |
| 372 |
PT INDOCEMENT QQ PT HWI |
Replace Castable To Brick at Cyclone , C1-2 & C2-2 |
May 14 |
| 373 |
PT CATURELANG PERKASA |
Supply Material & Installation of Insulation at LP, HP & Boiler (Shut Down) PT. Pertamina Talisman Jambi-Merang |
Mar 14 |
| 374 |
PT INDOCEMENT PLANT 9 |
Repair Insulation at Stabilizer Area |
Mar 14 |
| 375 |
PT INDOCEMENT PLANT 11 |
Repair Castable at Grate Cooler |
Feb 14 |
| 376 |
PT INDOCEMENT PLANT 7 |
Repair Castable at Grate Cooler |
Jan 14 |
| 377 |
PT INDOCEMENT PLANT 6 |
Repair Castable at Grate Cooler |
Jan 14 |
| 378 |
PT BANGUN SARANA BAJA |
Repair Refractory at Soaking Zone of Reheating Furnace |
Jan 14 |
| 379 |
PT INDOCEMENT PLANT 10 |
Repair Castable at Suspension Preheater & Cooler |
Oct 13 |
| 380 |
PT INDOCEMENT PLANT 9 |
Repair Castable at Cyclone C-1, Side Wall Cooler & Horse Shoe IKN |
Sep 13 |
| 381 |
PT INDOCEMENT PLANT 11 |
Repair Castable at Tertiary Air Duct (TAD) |
Jul 13 |
| 382 |
PT BANGUN SARANA BAJA |
Repair Skid Rail of Reheating Furnace |
Apr 13 |
| 383 |
PT INDOCEMENT PLANT 6 |
Repair Castable at Tertiary Air Duct (TAD) |
Apr 13 |
| 384 |
PT INDOCEMENT PLANT 9 |
Repair Castable at Suspension Preheater & Cooler |
Mar 13 |
| 385 |
PT INDOCEMENT PLANT 7 |
Refractory installation of Cyclone and Preheater |
Feb 13 |
| 386 |
PT INDOCEMENT PLANT 10 |
Repair Castable, Precast Curb Cooler, Horse Shoe and KOH |
Feb 13 |
| 387 |
PT LONTAR PAPYRUS PULP QQ PT HWI |
Repair Block Burner Of Tissue Drying Furnace |
Nov 12 |
| 388 |
PT INDOCEMENT PLANT 9 |
Horse Shoe Relining Castable |
Oct 12 |
| 389 |
PT BEKAERT INDONESIA |
ReliningCover Tunnel Furnace |
Oct 12 |
| 390 |
PT PUPUK KUJANG-CIKAMPEK QQ PT HWI |
Relining Refractories Translation Reformer A-101-B |
Sep 12 |